Laserfiche WebLink
<br />EUGENE CITY COUNCIL <br />AGENDA ITEM SUMMARY <br /> <br />c <br /> <br />Public Hearing: Resolution 4883 Adopting an Inflationary Adjustment of <br />Systems Development Charge Rates for Regional Wastewater System <br /> <br />Meeting Date: June 26, 2006 <br />Department: Public Works <br />www.eugene-or.gov <br /> <br />Agenda Item Number: 5 <br />Staff Contact: Fred McVey <br />Contact Telephone Number: 682-5216 <br /> <br />ISSUE STATEMENT <br />The purpose of this public hearing is to provide an opportunity for public comment regarding the <br />proposed adoption by resolution of the Metropolitan Wastewater Management Commission's (MWMC) <br />requested modifications to the regional wastewater systems development charge (SDC) rate schedule. <br />The proposed resolution implements updated regional wastewater SDC rates reflecting recent <br />modifications of the SDC methodology and applying an indexed inflationary adjustment. <br /> <br />BACKGROUND <br />On June 12,2006, the council adopted modifications to the MWMC regional wastewater SDC <br />methodology to reflect changes in capacity demand for certain development categories and to provide <br />for periodic adjustments to the SDC based on an adopted construction cost index. The MWMC <br />subsequently requested that the cities of Springfield and Eugene adopt modified rates reflecting an <br />inflationary adjustment to regional wastewater SDC rates, applying the adopted index and changes to <br />capacity demand requirements. <br /> <br />The modification of the SDC rate schedule reflects a two-year inflationary cost adjustment by application <br />of the published Engineering News-Record National20-City Average Construction Cost Index (ENR 20- <br />City CCI), the same index that is to be used to adjust the value of existing systems for inflation and that is <br />used to periodically adjust the City's other SDC rates. This adjustment increases rates by a total of <br />approximately 11 %. The MWMC revised SDC rate schedule also reflects change in user capacity demand <br />reflected in the recently adopted SDC methodology. The proposed effective implementation date for the <br />revised schedule is on permit applications made on and after August 1,2006. <br /> <br />The regional wastewater SDC rates were last modified by Resolution No. 4795, which adopted amended <br />SDC rates for the regional wastewater system, effective July 12, 2004. <br /> <br />RELATED CITY POLICIES <br />The cities of Eugene and Springfield and Lane County established the MWMC to implement a regional, <br />inter-agency approach to wastewater treatment. The policy issue before the council is whether to adopt <br />by resolution a modified regional wastewater SDC rate schedule as requested by the MWMC. <br /> <br />LICMOl2006 Council Agendas1M0606261S0606265.doc <br />