Laserfiche WebLink
<br />-- ~ <br />61 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />- - -- - <br />- - - ---- - - <br /> <br />Council Chambers <br />October 27, 1947 <br />Eugene, Oregon <br /> <br /> <br />II Minutes of the regular meeting of the Common Council of Eugene held October 27, ,:: <br />1947 at 7:30 P.M. The meeting was called to order by his Honor, Mayor Earl McNutt. ~:;' <br />Counci Imen present a t rollcall were - Crwnbaker, Ba iley, Johnson" Allen, Wells, ",', <br />and Pennington. Hawn and Davis absent. <br /> <br />Upon motion the minutes of the last regular meeting held October 14, 1947, <br />were considered read and approved. <br /> <br />1_, The City Manager presented for Council consideration the following bid on the <br />construction of buildings at the Swimming Pool site, which had been publicly <br />opened Friday, October 24, 1947 and scheduled as follows: <br /> <br />Frye-Schilling Co. <br />1 Rt. 2, Box 309A <br />Eugene, Oregon <br /> <br />Excavation: Unit Bid No. Total <br />Structural $ 6.00 per cu. yd. 225 $1,350.00 <br />Trench 4.00 per cu. yd. 90 360.00 <br />Compacted Backfill 2.50 per cu. yd. 560 1,400.00 <br /> <br />Concrete: <br />Class "A" Floor Slabs & Decks 27.00 per cu. yd. 170 4,590.00 <br />Class "A" Walls, Roof Slabs, Filters, <br />etc., requiring special forms 65.00 per cu. yd. 175 11,375.00 <br />Class "B"" Walkways 27.00 per cu. yd. 94 2,538.00 <br />(Alt.,) .Asphaltic Walkways 2.00 per sq. yd. 840 1,680.00 <br />Class "B" Curbs 35.00 per cu. yd. 45 1,575.00 <br />EXfansion Joint Material .40 per line ft. 1,250 500.00 <br />Furnishing & Installing) <br />Reinforcing Steel .12 per lb. 33,000 3,960.00 <br />(Furnishing & Installing) <br />I Structural Steel .50 per lb. 3,000 1,500.00 <br />(Furnishing & Installing) <br />Install all Piping, Fittings, Specials <br />and Valves. 1,350.00 <br />Install all 4", Ii", 1" and 3/4" G.I. <br />Pipe, Fittings, Hose Bibs, and Valves 374.00 <br />Install Hair & Lint Catcher, Throttling <br />Valve, Rate of Flow Controller & Re- <br />circulation pump 385.00 <br />Install Filter Gravel & Sand 100.00 <br />Install all Power Wiring 242.00 <br />Install Exterior Flood Lighting 1,105.00 <br />Install all Building Wiring 679.25 <br />Install all Plumbing & Fixtures 1,704.00 <br />Install Heating System 3,681.70 <br />Furnish & Install Wire Fence 2,325.00 <br />Furnish & Install 4'x9' Gates 150.00 <br />Furnish & Install 10' x 9~ Gates 105.00 <br />Furnish & Install 4' Fence 633.70 <br />Install 5 tier Bleachers 500.00 <br />Install 4 tier Bleachers 300.00 <br />Furnish & Place Brickwork in Stack 1,540.00 <br />& Entry Facing <br />Furnish & Install Base Rock & Bituminous <br />Concrete in Roadways & Parking Areas 2.00 pe~ sq. yd. 3,385 6,770.00 <br />I Furnish & Install Crushed Rock & <br />Bituminous Concrete in Walks, Bicycle <br />and Bleacher Area. 1.75 per sq. yd. 1,260 2,205.00 <br />Furnish & Install Glass Blocks 85.00 <br />Furnish & Install 15 Year Roofing <br />including Roof Flashing & Parapet <br />Top Board 1,600.00 <br />Furnish & Install 15 Year Roofing <br />excluding Parapet Top Board & Flashing 1,300.00 <br />I Furnish & Apply One Primer Coat & One <br />Finish Coat of Roofing Asphalt Water <br />- Proofing to Roof Slab & Inside Parapet Wall 500.00 <br />Furnish & Install Roof Ventilators 460.00 <br />Furnish & Install All Sash 894.00 <br />Furnish & Install All Doors 381.25 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~ <br />