Laserfiche WebLink
<br />Public Works Director reviewed the bids submitted. He explained that sewer <br />reconstruction between Lawrence and Washington form Cheshire to'3rd was held <br />until completion of the Washingto~/Jefferson overpass construction. Recommen- <br />dation was to award contracts to the low bidders on both projects. <br /> <br />Mrs. Beal moved seconded by Mr~ Williams to award contracts to low bidders as <br />recommended. Rollcall vote.. Motion 'carried",~ll. councilmen present voting <br />. = 'aye . " <br /> <br />B. Bids, Parks Department - Opene~ April~9, 1973 <br /> <br />e <br /> <br />Amazon Park - concrete walks around Amazon Village; asphalt ped/bike path from <br />24th to 29th along Amazon Channel; drainage of areas along asphalt path. <br /> <br />Wildish Construction <br />Shur-Way Contractors <br />Devereaux & Pratt <br />Eugene Sand & Gravel <br />Benge Paving <br /> <br />$ 28,702.85 <br />29,976.01 <br />30,801.40 <br />31,411.20 <br />31,635.30 <br /> <br />31,843.20 <br /> <br />Completion date <br />August 1, 1973 <br /> <br />Office Estimate <br /> <br />We recommend that Wildish Constructipn be awarded the contract for this work. <br />We are studying the possibility of continuing the path from 29th to 30th, due <br />to the good unit prices involved. <br /> <br />. <br /> <br />Skinner's Butte, Gate~'/ay (Ferry SL Bridge) Area - extension of south bank <br />trail to E.W.E.B. area, and River/Baker Park viewing terrace. <br /> <br />Concrete Unlimited <br />Wildish Construction <br />Devereaux & Pratt <br /> <br />$ 8,04l~.22 <br />9,407.00 <br />11,022.50 <br />10,099.00 <br /> <br />Completion date <br />August i, 1973 <br /> <br />Office Estimate <br /> <br />We recommend that Concrete Unl imited be awarded the contract for the V/Oil<. ,. <br />Due to the low bid on this work, we anticipate neg6tiating for some drain <br />tiling along the walk to help with the poor drainage in the turf area. <br /> <br />Skinner's Butte - Paving overlay on western portion of road ascending <br />Skinner's Butte, beginning near the parks warehouse. A portion of this <br />lies within the Lincoln Street R/W and is not a part of the B.O.R. Skinner's <br />Butte Phase III project. Bob has made arrangements with Don Allen that <br />public works pay for the tonnage applied vJithin the Lincoln Street R/h'. T:lis <br />will amount to about 94 tons of the estimated total of 347 tons. The follow- <br />ing bids are for the total amount, including preparation and the tack coat: <br /> <br />.- <br /> <br />Wildish Construction <br />Eugene Sand & Gravel <br />Benge Paving <br />~hur-Way Contracto~s <br />Office estimate <br /> <br />$ 8.75/ton ($3,036.25)' <br />$ 9.49/ton~ ($3,293.03) <br />$ 9.73/ton ($3,376.31) <br />_p1.7~lton ($4,077.25) <br />$11. 00/ton--{$3 ,817.06) <br /> <br />Completion date <br />June 1, 1973 <br /> <br />We recommend that Wildish Construction be awarded the contract for this <br />. work. <br /> <br />Mrs. Beal moved seconded by Mr. Williams to award contracts to low bidders as <br />recommended. 'Rollcall vote. Motion carried, all '(',;:ouncilmen present voting aye. <br /> <br />C. Planning Commission Recommendations <br /> <br />1. <br /> <br />Annexation area south of Crest Drive and west of Blanton Drive <br />(10.55 acres) (Oak ~eal~t) <br />This annexation was approved previously but because of technical <br />error was not completed. Planning Commission recommended transmittal <br />again to the Boundary Commission. <br /> <br />'.' <br /> <br />"'" <br /> <br />Resolution No. 2167 - Transmitting to Boundary Commission request to <br />annex area. south of Crest Drive and west of Blanton Drive was submitte~ <br /> <br />'. ~ - - ..t <br /> <br />- - .- <br /> <br />Edna Shirey.,- 3217 Whitten-Drive, speaking for <br />asked that ietter from that group be read into <br />indicating opposition to the annexation ondthe <br />findings on which to recommend to the Boun ary <br /> <br />the Crest Drive eitizens <br />the record. It was read <br />basi$ toat there were no <br />CommlSSlon tnat the area <br /> <br />group, <br />later <br />t;~c~Hfl~xed. <br /> <br />I ,., <br /> <br />4/23/73 - 4. <br />