Laserfiche WebLink
<br /> -~--- <br />, <br />. alternative modes would diminish the demand for downtown parking. He stated <br /> that if the shuttle forms a core circulation loop with good connections at <br /> peak times, it can help alleviate the demand. <br /> Ms. Bascom stated that a goal of the shuttle would be to increase the exchange <br /> between the university and the downtown, since both places host many events <br /> and have parking shortages. <br /> Mr. Green noted the concern of midtown merchants that on-street parking there <br /> is inadequate and the proposed s~uttle route would not address their custom- <br /> ers' needs. Mr. Viggiano responded that a route south to approximately 18th <br /> Avenue would entail both a cost disadvantage and a circuitous trip for <br /> passengers traveling between the university and downtown. <br /> Mr. Nicholson stated that it is important to address the university's parking <br /> problems, especially at Autzen Stadium, and the current shuttle proposal would <br /> not do so. He asked whether the shuttle could include a loop over the Ferry <br /> Street Bridge, perhaps including Valley River Center, if the bridge is widened <br /> or supplemented with another bridge. Mr. Viggiano said the suggestion could <br /> be reviewed. <br /> In response to Ms. Bascom's question, Mr. Viggiano said that the shuttle would <br /> cost between $100,000 and $400,000 per year to operate, with the higher costs <br /> for service about every seven minutes. Buses cost approximately S200,000. <br /> Mr. Billings said that lTD is interested in purchasing a new type of less- <br /> polluting bus by 199B. The shuttle vehicle would be distingUishable from <br />. regular lTD buses. <br /> Mr. luell stated that the approaches to mitigating loss of downtown parking to <br /> the new transit station assume a substantial increase in use of alternative <br /> modes. He said that a supply-and-demand study--assuming a new library, <br /> renovation of the Atrium Building, and full build-out downtown--has projected <br /> a deficit of 670-770 parking stalls within a nine-block radius of the new <br /> transit station site. The deficit is projected to develop during the coming <br /> five to ten years. The three pOSSible approaches to the problem are I} <br /> structured parking only; Z) alternative modes and structured parking; or 3) <br /> alternative modes only. The second approach appears most consistent with <br /> council policy and the needs of large-scale parking consumers such as lane <br /> Community College's (LCC's) Downtown Center. <br /> Mr. Luell presented three options to implement the second approach: <br /> * Option A, a freestanding parking structure that would create a net of <br /> 225 spaces at an estimated cost of $6-B million. Advantages: would <br /> support the proposed library and future west-end development. Disad- <br /> vantages: a projected operating shortfall for at least five years. <br /> * Option B, expansion of the Overpark, that would create a net of 135 <br /> spaces at an estimated cost of $4.5-5.5 million. Advantages: would <br /> support existing demand; responsive to LCC's needs; and has positive <br />. MINUTES--Eugene City Council November 23, 1992 Page 3 <br /> 5:30 p.m. <br />