<br />II. Public Hearings <br />A. Civic Center Project: Schematics, Budget--Materials Distributed. <br /> <br />Manager said the presentation would deal with the schematics and <br />cost of the project. The Council has the recommendations of the <br />Civic Center Commission before it. Also for Council IS consideration <br />is a recommendation from the Downtown Development Board to spend funds <br />for foundation of the parking structure. In reviewing the history of <br />Council action to date, he noted the Council had only acted on <br />requesting an $18.5 million bond issue to be voted on by the voters, <br />and authorized appointment of the architect. He said there will be <br />several other action points for Council which were described in <br />materials submitted. Those would come as recommendations from the <br />Civic Center Commission. <br /> <br />.-) <br /> <br />Norman Pfeiffer, Hardy Holzman Pfeiffer Associates, said Council's <br />actions on the recommendations being made this evening will have <br />a great impact on the Performing Arts Center, which hopefully will be <br />opened three years from now. Regarding the design process, he said <br />the primary issue is the preservation of a two-hall concept. The plan <br />as presently designed consists of two rooms: one large hall primarily <br />oriented for professional/musical performances, and a small room <br />designed primarily for speech/theater, which would be used more often <br />by the community. The complex would consist of approximately 120,000 <br />square feet. He said this represents a reduction from the original <br />design of 20,000 square feet. This reduction was necessary to bring <br />the project within the $18.5 million budget. He did not believe it <br />possible to reduce the facility in area or activity space any further <br />without compromising the notion of a two-hall facility. <br /> <br />- <br /> <br />The goals are extremely high, but the rewards to the community will be <br />great. To achieve the goal of a two-hall facility would require some <br />dollars in excess of the $18.5 million. There were a number of <br />reasons cited by Mr. Pfeiffer for this outcome. The original numbers <br />were lower than realistic to achieve these goals. The time schedule <br />now is not the original one which resulted in increased costs because <br />of inflation. There have been some line items for administrative <br />costs that have to come out of the $18.5 million that were not <br />originally anticipated. He said the choices for Council were simple: <br />add the additional funds from the bond interest, or make major cuts in <br />the program. He did not recommend the entire facility be reduced in <br />size or quality. He said that Council was facing a very specific <br />issue: obtaining additional costs to accomplish the goals it has set <br />to obtain this facility. <br /> <br />Other issues at stake mentioned by Mr. Pfeiffer were that the facility <br />will be tailored both to professional and community performers. All <br />are integral to bring vitality to Eugene that cannot be done with <br />just one single facility. The community/professional performers' <br />use of the facilities will complement one another. He felt this to be <br /> <br />4/9/79--2 <br /> <br />.- <br /> <br />\'\3 <br />