Laserfiche WebLink
(3) <br /> <br />Streets and Alleys. <br />(a) The developer shall grade and pave all streets and alleys in the <br /> development site. All paving shall be to the width specified in EC 9.6870 <br /> Street Width and provide for drainage of all such streets and alleys~ and <br /> construct cttrbs and gutters within the development site according to the <br /> Design Standards and Guidelines for Eugene Streets, Sidewalks~ Bikeways <br /> and Accessways and standards and specifications adopted pursuant to <br /> Chapter 7 oft?tis code and other adopted plans and policies. Private <br /> streets and alleys are prohibited unless the developer can demonstrate to <br /> the satisfaction of the planning director that a public street is not necessary <br /> for compliance with this land use code and EC 9.6815 Cormecti-¼t¥ for <br /> Streets. Private streets shall be designed and constructed according to the <br /> Design Standards and Guidelines for Eugene Streets, Sidewalks, Bikeways <br /> and Accessways and standards and specifications adopted pursuant to <br /> Chapter 7 of this code. <br />(b) The developer shall pave streets and alleys adjacent to the development <br /> site to the width specified in EC 9.6870 Street Wide, unless such streets <br /> and alleys are already paved to that width, provided the City makes <br /> findings to demonstrate consistency with constitutional requirements. <br />(c) The standard at (3)(b) may be adjusted if consistent with the criteria of EC <br /> 9.8030(19)~ <br /> <br />Section 9.6510 of the Eugene Code, 197 l s is arr~ended to provide: <br /> <br />%6510 <br /> <br />StOrmwater Drainag~ An applicant proposing a new development must submit <br />documentation to the City showing the stormwater drainage facilities into which the <br />proposed develoPment will drain. The documentation must establish that the new <br />development will drain into existing stormwater drainage facilities thaL considering <br />all developments that have received tentative or final plan approval as of the date the <br />developer submits a complete application, have the capacity to handle the stormwater <br />drainage that will be generated by the proposed new development, or, if the applicant <br />c~ot establish that existing stormwater drainage facilities have such capacity, the <br />applicant must construct storm drainage facilities to accommodate the stormwater <br />draining from the proposed development. The applicant must dedicate public <br />easements approved by the city over the stormwater drainage facilities provided the <br />c~ty makes findings to demonstrate consistency with constitutional requirements. <br />Sto~water drainage facilities shall be designed and constructed according to adopted <br />plans and policies~ and in accordance with standards in Chapters 6 and 7 of this code~ <br />The conveyance of ownership or dedication of easements may be required in any of <br />the fbllowing circumstances: <br />(1) (a) Except for areas on the city's acknowledged Goat 5 inventory', where the <br /> subject property in the proposed development is or will be periodically <br /> subject to accumulations of surface water or is traversed by an5, open <br /> <br />Ordinance - 3 <br /> <br /> <br />