Laserfiche WebLink
Exhibit A <br />to Administrative Order No. 58-21-22-F <br /> <br />PUBLIC WORKS PROFESSIONAL SERVICES FEE SCHEDULE <br />(Effective September 12, 2021) <br /> <br /> <br />Class Description Fees <br />4013 Associate Engineering Technician ........................................ $133.00 per hour <br />4009 Engineering Technician 1 ..................................................... $103.00 per hour <br />4012 Engineering Technician 2 ..................................................... $119.00 per hour <br />4110 Civil Engineer 1 .................................................................... $136.00 per hour <br />4111 Civil Engineer 2 .................................................................... $153.00 per hour <br />6110 Electrician 1 .......................................................................... $110.00 per hour <br />6120 Electrician 2 .......................................................................... $120.00 per hour <br />9198 Engineering Dev/Review Manager ....................................... $169.00 per hour <br />5320 Landscape Architect .............................................................. $136.00 per hour <br />5319 Traffic Engineering Tech 2 ................................................... $101.00 per hour <br /> <br /> <br />Employees Temporarily Assigned to the Professional Services Funds Other employees <br />may be charged <br />at an hourly rate <br />based on salary, <br />fringe benefits, <br />and overhead <br />costs. <br />As-Constructs & Warranty Inspection Fees: <br />(Fees are based upon the bonded value of the public improvements.) <br />Small Development (less than $25,000) .......................................................... $500.00 <br />Medium Development ($25,000 to less than $100,000) .................................. $1,000.00 <br />Large Development ($100,000 to $500,000) ................................................... $1,500.00 <br />Very Large Development (greater than $500,000) ............................................... % x <br />construction <br />costs