Laserfiche WebLink
<br />Airport is the second largest category with $46.8 million in proposed projects. Terminal Building <br />Expansion accounts for $16.2 million in this category. Other significant projects include Concourse C <br />Addition, Automated Car Wash Facility, Access Road Improvements and Taxiway Rehabilitation. <br />Smaller projects include overlay of runways, taxilane reconstructs, and acquiring snow removal <br />equipment vehicles. <br /> <br />Public Buildings and Facilities projects include significant improvements during the CIP period totaling <br />$25.5 million. Projects include preservation and maintenance of existing City facilities such as the Hult <br />Center and Parking Garages. <br /> <br />The Stormwater system is planning to invest $13.5 million on improvements in this CIP. A major new <br />project is the Underground Injection Control (UIC) Facility Removal, which is prompted by new <br />Department of Environmental Quality (DEQ) requirements to remove stormwater drywells. Other <br />projects include various streambank and outfall stabilization projects, restoration and enhancement of <br />the wetlands in West Eugene, and ongoing stream corridor acquisition. <br /> <br />The City’s Wastewater system is scheduled to spend $13.1 million on capital projects in the next six <br />years. Included in these improvements is $12.1 million to preserve and rehabilitate the aging <br />wastewater system, decrease inflow and infiltration and address increased wet weather flows. <br /> <br />The Parks and Open Space program is anticipating about $6.6 million of improvements during the CIP <br />period. Of this amount, $3.7 million is dedicated to preservation and maintenance of existing park <br />assets, while $2.0 million will be used for neighborhood and community park land acquisition supported <br />by the Parks System Development Charges (SDC) revenues. <br /> <br /> <br />Unfunded Projects <br />Also included in the CIP are projects totaling $162.1 million for which funding has not been identified. <br />Transportation projects continue to reflect significant need for additional funding. The CIP includes <br />approximately $98.3 million of unfunded transportation projects that would upgrade and enhance <br />capacity and preserve and maintain existing assets, as well as build new bike paths, collectors and other <br />improvements. The Public Buildings and Facility category contains approximately $38.6 million in <br />unfunded projects. Parks and Open Space category has $15.5 million in unfunded projects. <br /> <br /> <br />CIP Development and Review <br />In the fall of even-numbered years, staff compiles the Draft CIP using input and requests from a variety <br />of sources, including neighborhood groups, individual citizens, adopted plans and policies. <br /> <br />The draft CIP document was made available on the City’s web site in mid-January of 2011. Information <br />about the draft FY 2012-17 CIP was also sent electronically to all of the neighborhood association chairs <br />and co-chairs, as well as the representatives of the Neighborhood Leaders Council (NLC). Hard copies <br />of the draft CIP were made available to the public at all Library locations, the Finance Division, and the <br />City Manager’s Office. <br /> <br />On February 2, 2011, the Budget Committee reviewed and discussed the draft CIP. The Budget <br />Committee approved a motion to recommend that the council adopt the draft CIP, with 12 members in <br />favor, one opposed, and one abstaining. <br /> <br /> \\Cesrv500\cc support\CMO\2011 Council Agendas\M110222\S1102221.doc <br /> <br />