Laserfiche WebLink
<br /> <br />2.Design Toolkit that serves as a best practice guide for updating the City’s design standards and <br />guidelines <br /> <br />3.List of proposed capital projects and feasibility studies that will replace the pedestrian and <br />bicycle projects in the current TransPlan <br /> <br />4.List of intersections that have been identified for further analysis to identify safety issues and <br />potential improvements <br /> <br />5.Recommended code revisions. <br /> <br />Staff recommends that the revised draft of the PBMP be brought back to the council for acceptance <br />during early 2012. The plan will be officially adopted around mid-2013 as part of the TSP adoption <br />process. In the interim, the accepted PBMP will serve as a blueprint for pedestrian and bicycle planning <br />activities including grant writing, facility development and network improvements. <br /> <br /> <br />RELATED CITY POLICIES <br />The Transportation System Plan is being updated as directed by the City Council in 2008, to provide an <br />integrated land use/transportation plan with the development of Envision Eugene. The TSP will include <br />policies from the Pedestrian and Bicycle Master Plan. <br /> <br /> <br />COUNCIL OPTIONS <br /> <br />Provide feedback to staff on draft Pedestrian and Bicycle Master Plan. <br /> <br /> <br />CITY MANAGER’S RECOMMENDATION <br /> <br />Not applicable, as no action is requested at this time. <br /> <br /> <br />SUGGESTED MOTION <br /> <br />Not applicable, as no action is requested. <br /> <br /> <br />ATTACHMENTS <br /> <br />A. Online Survey Summary (October 2011) <br />B. Summary of PBMP Draft Comments (Fall 2011) <br />C. Timeline <br /> <br /> <br />FOR MORE INFORMATION <br /> <br />Staff Contact: Reed Dunbar <br />Telephone: 541-682-5727 <br />Staff E-Mail: reed.c.dunbar@ci.eugene.or.us <br /> <br /> <br /> <br /> S:\CMO\2011 Council Agendas\M111114\S111114A.doc <br />