Laserfiche WebLink
Metro Plan. (page 11-C-41 <br />highest priority. (page 11-C-41. <br />Policy 16. Ultimately, land within the UGB shall be annexed to a city and provided with <br />the required minimum level of urban facties and services. While the time frame for <br />5nrtexatkn iii-f i- <br />urban. (page <br />As previously discussed in this subsection, and further detailed under subsection (3) <br />below, the proposed annexation is consistent with Metro Plan growth management <br />policies and can be served by the minimum level • key urban services. The annexation <br />procedures beginning at EC 9.7800 are consistent with State law and therefore, as found <br />throughout this report, the annexation is consistent with State law. <br />EC 9.7825(3) The proposed annexation will result in a boundary in which the minimum level of key <br />urban facilities and services, as defined in the Metro Plan, can be provided inan orderly, <br />efficient, and timely manner. <br />L Za <br />• Ni <br />a - • <br />WIN 0 a" , I � <br />7117MINT-TEWOMMIFT'lom- = <br />Wastewater <br />An 8-inch public wastewater line is within Crocker Lane, adjacent to this site. Sewer <br />connection records (#40088) indicate a connection to the public system within River <br />Road. The related wastewater assessments have been paid. <br />Satterwhite Family Trust (A 12-1) July 2012 Page 2 <br />