Laserfiche WebLink
(4) Describes the long -term (35 year) multiple objective capital improvement <br />program for River Road -Santa Clara (including water quality, flood <br />control and storrwater- related natural resources projects as well as stream <br />corridor acquisitions) and stonrwater development standards that would, <br />together and along with the other multitude of activities in the stormwater <br />program, address the identified problems and opportunities; and <br />(5) Compliments the adopted 2002 Storrnwater Basin Master Plans which <br />describe the City's drainage criteria for design of stormwater system <br />improvements. <br />E. The drainage criteria for design of stormwater system improvements contained <br />in the Basin Plan, and other specific information about design storm events and analysis and <br />design methods serve as guidance to the City and the public and are neither requirements nor <br />prohibited conduct. <br />Now, therefore, based on the above findings, which are hereby adopted: <br />IT IS HEREBY ORDERED THAT: <br />1. The River Road -Santa Clara Stormwater Basin Master Plan (Basin Plan) attached <br />to this Order is hereby approved, and shall be utilized by staff on the Public Works Department <br />in lieu of the 1990 Otak Areawide Drainage Master Plan for River Road —Santa Clara in <br />evaluating development proposals. The Basin Plan shall not be used as approval criteria. <br />2. Copies of this Order shall be forwarded to all Public Works Department Division <br />Managers. <br />Dated this ' Z day of <br />oa tv- .2012. <br />K , rt Corey, Exec )tnment <br />Director <br />Public Works Dept <br />Administrative Order - Page 2 of 2 <br />