UTILITY RIGHT -OF -WAY USE PERMIT FEES <br />(Effective January 1, 2004) <br />I. Annual "Blanket" Permits (3) <br />Application <br />Activity <br />$500.00 per permit <br />$100.00 per each Provider activity <br />II. Individual Permit Costs: <br />III. Major Aerial Installation Permit Fee <br />If the activity to be permitted on an individual permit involves a primarily aerial installation only , and <br />°xceeds 26,400 feet (5.0 miles), the permit fee shall be computed in two steps, as follows: <br />Step One. The initial 26,400 feet (5.0 miles) shall be permitted under the existing site specific <br />permit fee contained in Section 11. <br />Step Two. All additional footage over 26,400 feet (5.0 miles) shall be computed at the rate of $ <br />0.10 cents per foot. Primarily aerial installations only that are less than 26,400 feet and not specifically <br />authorized under a blanket permit remain subject to the site specific permit fees of Section 11 of this <br />schedule. <br />For purposes of this section, "primarily aerial installation" is the installation of wire or cable type <br />facilities on existing poles or approved above - ground structures. The installation or replacement of pole <br />anchors may be approved as part of an aerial installation permit as long as the installation is completed within a <br />radius of 10 feet from the existing pole or structure. Other ancillary equipment and underground facilities shall <br />not be considered aerial components under this Schedule and as such shall require a separate site specific permit <br />under Section 11 of this Schedule. In addition to these requirements, all aerial activities shall comply with the <br />standards contained within the Utility and Right-of-Way Permits Construction Within and Use of the Public <br />Way Policies and Procedures Manual, and other applicable documents. <br />IV. Additional Fees <br />• Failure to maintain "approved plans" on work site at all times: $100 per occurrence. <br />• Deviation from "approved plans" without prior authorization of the Utility Inspector: $500 per <br />Exhibit A - I <br />J:%e main\00090%001a%00068448.WFD(12 /26/03) <br />1 Facili <br />Joint <br />2 Facilities <br />Trench (2 <br />4 Facilities <br />3 Facilities <br />Street Type (4 )(5) <br />Local <br />Arterial <br />Local <br />Arterial <br />Local <br />Arterial <br />Local <br />Arterial <br />Projects 0 to 99 ft. <br />$350 <br />$410 <br />$230 <br />$275 <br />$205 <br />$240 <br />$200 <br />$235 <br />Projects from 100 to 499 ft. <br />$435 <br />$460 <br />$285 <br />$345 <br />$250 <br />$305 <br />$235 <br />$290 <br />Projects from 500 to 999 ft. <br />$555 <br />$670 <br />$365 <br />$425 <br />$310 <br />$385 <br />$300 <br />$350 <br />Projects 1000 to 2000 ft.(l) <br />$715 <br />$890 <br />$470 <br />$580 <br />$405 <br />$495 <br />$370 <br />$460 <br />III. Major Aerial Installation Permit Fee <br />If the activity to be permitted on an individual permit involves a primarily aerial installation only , and <br />°xceeds 26,400 feet (5.0 miles), the permit fee shall be computed in two steps, as follows: <br />Step One. The initial 26,400 feet (5.0 miles) shall be permitted under the existing site specific <br />permit fee contained in Section 11. <br />Step Two. All additional footage over 26,400 feet (5.0 miles) shall be computed at the rate of $ <br />0.10 cents per foot. Primarily aerial installations only that are less than 26,400 feet and not specifically <br />authorized under a blanket permit remain subject to the site specific permit fees of Section 11 of this <br />schedule. <br />For purposes of this section, "primarily aerial installation" is the installation of wire or cable type <br />facilities on existing poles or approved above - ground structures. The installation or replacement of pole <br />anchors may be approved as part of an aerial installation permit as long as the installation is completed within a <br />radius of 10 feet from the existing pole or structure. Other ancillary equipment and underground facilities shall <br />not be considered aerial components under this Schedule and as such shall require a separate site specific permit <br />under Section 11 of this Schedule. In addition to these requirements, all aerial activities shall comply with the <br />standards contained within the Utility and Right-of-Way Permits Construction Within and Use of the Public <br />Way Policies and Procedures Manual, and other applicable documents. <br />IV. Additional Fees <br />• Failure to maintain "approved plans" on work site at all times: $100 per occurrence. <br />• Deviation from "approved plans" without prior authorization of the Utility Inspector: $500 per <br />Exhibit A - I <br />J:%e main\00090%001a%00068448.WFD(12 /26/03) <br />