Laserfiche WebLink
<br />The development will have onsite staff and security: six to eight full-time jobs and six part-time <br />jobs. The full-time staff will consist of a property manager, an assistant manager, a leasing <br />director, a leasing professional, a chief building engineer, a maintenance technician, and porters. <br /> <br />The proposed construction schedule would be 14-16 months long and provide an average of 120- <br />150 construction jobs. If the MUPTE is approved, construction would begin in February/March <br />2014. <br /> <br />Project Parking <br />The surface level secured parking on-site would be accessed from Ferry Street with a key card <br />system. The parking will be fully enclosed as part of the architecture of the building and not <br />readily apparent. A second parking area is proposed to be a surface parking lot nearby within ¼ <br />mile at 901 Franklin. (See Attachment B for the location of the proposed surface parking.) The <br />property is City-owned and currently used as surface parking. The City has been marketing this <br />surplus property for sale since 2011. Core Campus has expressed an interest in leasing or <br />acquiring the site. <br /> <br />MUPTE Program <br />The MUPTE program is enabled by state legislation and designed to encourage higher density <br />housing and redevelopment in the core area and along transit corridors. The objective strongly <br />aligns with several of the pillars of Envision Eugene. Increasing the amount of multi-family <br />housing in the downtown and along transit corridors helps reduce pressure on urban growth <br />boundary (UGB) expansion and protects existing neighborhoods. <br /> <br />The program provides a 10-year property tax exemption on qualified new multi-unit <br />housing investments that occur within a specific, targeted area, that meet program <br />requirements, and that are reviewed and approved by the council. During the exemption period, <br />property owners still pay taxes on the assessed value of the land and any commercial portions of <br />the project, except those commercial improvements deemed by the council to be a public benefit <br />and included in the exemption. In September 2011, the council added the option to exempt the <br />commercial portion of a multi-unit housing project to the extent that the commercial property is <br />required or considered to be a public benefit. The council amended Eugene’s code provisions in <br />November 2008, to assist both staff and the council in evaluating a MUPTE application with: 1) <br />adoption of approval criteria and 2) direction to the City Manager to adopt a public benefit scoring <br />system (described below). <br /> <br />Staff’s review of the Core Campus MUPTE proposal is based on the current program requirements. <br />As ideas and potential revisions to the MUPTE program have emerged from the City Council’s <br />discussions, staff have had conversations with the developer about the possibility of <br />incorporating elements of the MUPTE revisions into proposed conditions of approval. <br /> <br />Public Comments <br />A display advertisement was published in The Register Guard on May 4, 2013, soliciting comments <br />for 30 days on the Core Campus MUPTE application. The period ends on June 3, 2013, at 5 p.m. <br />All written comments received by staff through May 21 are included as Attachment C. The <br />Downtown Neighborhood Association Steering Committee unanimously took a position of support <br />S:\CMO\2013 Council Agendas\M130529\S130529B.doc <br />