Laserfiche WebLink
<br />M I NUT E S <br /> <br />e <br /> <br />Eugene City Council Dinner Meeting <br />Eugene Conference Center <br />Wilder/Hansbery Room <br /> <br />May 14. 1984 <br />5 p.m. <br /> <br />PRESENT: Brian Obie. Council President; Cynthia Wooten. Joyce Nichols. <br />Emily Schue. Dick Hanson. Freeman Holmer. Betty Smith. Councilors; <br />Barbara McCarty. Airport Commission; Micheal Gleason. Bob Shelby. Ed <br />Smith. Jody Miller. Glen Potter. Tim Birr. Dave Whitlow. Gary Long. <br />Cathy Freedman. staff. <br /> <br />Councilor Obie opened the meeting and introduced Barbara McCarty. Chair. <br />Airport Commission. <br /> <br />I. AIRPORT TERMINAL EXPANSION PROJECT <br /> <br />e <br /> <br />Mr. Shelby reviewed the history of the airport project leading up to the <br />present. A conceptual airport design that would meet needs into the year <br />2000. partially funded by the airline carriers. was completed in 1979. Using <br />components of that design. a new plan has been developed including a basic <br />package with additive options. <br /> <br />Mr. Shelby distributed a fact sheet of projected cost estimates of the basic <br />package and additive options dated December 1983. The total basic package cost <br />estimate is $10.523.363; the additive options to the terminal building amount to <br />$3.245.233; the optional landside development amounts to $301.630. for a total <br />program cost estimate of $14.070.226. <br /> <br />A Federal grant has been received to begin the engineering design for a <br />portion of the apron and relocation of a taxiway. The construction grant is <br />expected in the next four or five weeks. Construction is expected to begin <br />next spring. <br /> <br />The major areas addressed by the basic package include: the baggage claim area. <br />the security boarding area. public lobby space. ticketing lobby. the terminal <br />apron. and entrance and access roads to the terminal. <br /> <br />Mr. Smith then described the schematic drawings of the basic package and additive <br />options. including the following: <br /> <br />overall terminal building expansion. <br />exterior views of east face and southwest face. <br />various views of roof configurations. <br /> <br />Changes in the above-mentioned basic plan areas. including changes in the <br />restaurant. restrooms. and gift shop were explained in detail during the <br />~ presentation. <br /> <br />MINUTES--Eugene City Council Dinner Meeting <br /> <br />May 14, 1984 <br /> <br />Page 1 <br />