My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20316
COE
>
City of Eugene
>
Ordinances
>
2004 No. 20307-20332
>
Ordinance No. 20316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:45:08 PM
Creation date
10/12/2004 11:49:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
4/12/2004
Document_Number
20316
CMO_Effective_Date
5/15/2004
Author
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The number of surface parking lots downtown continues to diminish as development <br />occurs, adding greater intensity of uses. In the past, the use of financial tools to assist <br />with providing downtown parking has often been critical to the success of redevelopment <br />for projects such as Broadway Place. The City needs to refine the parking program in the <br />downtown area and continue to collaborate with property owners and developers to <br />address parking demand. <br /> <br />The location and design of parking downtown is critical. Parking areas need to be easily <br />available near downtown destinations. On-street parking should be provided wherever <br />practical. Entrances to parking structures and lots should be located for pedestrian safety <br />and to maximize pedestrian activity at street level. <br /> <br />Multi -Modal Connections <br />Easily accessible links among different modes of transportation, as well as parking, make <br />getting around downtown smoother. This plan supports enhanced and well marked <br />connections between bus and shuttle routes, the train depot, and the eventual relocation of <br />intercity and interstate bus service proximate to the train depot area. <br /> <br />Policies <br /> <br />Develop a transportation system that supports the vision of a vital downtown and <br />provides for the safe and efficient movement of automobiles, pedestrians, bicycles, <br />and emergency and transit vehicles. <br /> <br />2. Promote and support alternative modes and accessibility through strategic planning <br /> and public investment. <br /> <br />Enhance functional designs for streets, sidewalks and related public improvements <br />with carefully chosen design elements, including materials, alignments, plantings, and <br />streetscape elements. <br /> <br />Implementation Strategies <br /> <br />A. Develop specific designs and public improvement plans to convert portions of <br /> Willamette, Broadway, 5th Avenue and 8th Avenue to "Great Streets." <br /> <br />B. Implement the policies and strategies of CATS, including two-way street conversions, <br /> structured parking, pedestrian and bike system improvements. <br /> <br />Facilitate increased residential and commercial densities within the downtown area to <br />support increased transit, pedestrian and bicycle activity in the area. Require new <br />developments to follow transit and pedestrian-oriented development design <br />guidelines. <br /> <br />40 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.