My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20519
COE
>
City of Eugene
>
Ordinances
>
2013 No. 20504 - 20519
>
Ordinance No. 20519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2013 7:26:46 AM
Creation date
11/21/2013 7:26:15 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20519
Document_Title
AN ORDINANCE AMENDING THE EUGENE-SPRINGFIELD METROPOLITAN AREA GENERAL PLAN TEXT, CHAPTER IV; ADOPTING A SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE DATE.
Adopted_Date
11/18/2013
Approved Date
11/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Finding #20. The Environmental Resources Element includes policies addressing the use and <br />preservation of forest lands (Metro Plan III -C -5). The proposed Chapter IV amendments do not change <br />these policies. <br />Goal 5 — Open Spaces, Scenic and Historic Areas, and Natural Resources. Goal 5 covers more than a <br />dozen natural and cultural resources such as wildlife habitats and wetlands. It establishes a process <br />for each resource to be inventoried and evaluated. <br />Finding #21. The Metro Plan Environmental Resources and Historic Preservation Elements contain <br />policies (Metro Plan pgs. III-C-3,111-1-2) addressing Goal 5 resource protection. Eugene and Springfield <br />have policies regulating the inventory and protection of Goal 5 resources in their respective <br />development codes. The proposed Chapter IV amendments do not change the resource policies or <br />protections found in the Metro Plan or in the Eugene and Springfield development codes. <br />Finding #22. OAR 660 - 023 -0250 (3) narrows the applicability of Statewide Planning Goal 5 to <br />comprehensive plan amendments (PAPA): <br />(3) Local governments are not required to apply Goal 5 inconsideration of a PAPA unless the PAPA <br />affects a Goal 5 resource. For purposes of this section, a PAPA would affect a Goal 5 resource only if: <br />(a) The PAPA creates or amends a resource list or a portion of an acknowledged plan or land use <br />regulation adopted in order to protect a significant Goal 5 resource or to address specific <br />requirements of Goal 5; <br />(b) The PAPA allows new uses that could be conflicting uses with a particular significant Goal 5 <br />resource site on an acknowledged resource list; or <br />(c) The PAPA amends an acknowledged UGB and factual information is submitted demonstrating <br />that a resource site, or the impact areas of such a site, is included in the amended UGB area. <br />Subsections (a) through (c) above are not applicable to this request as the proposed Chapter IV <br />amendments do not create or amend a list of Goal 5 resources, do not amend a plan or code provision <br />adopted in order to protect a significant Goal 5 resource or to address specific requirements of Goal 5, <br />do not allow new uses that conflict with Goal 5 and do not amend the acknowledged Urban Growth <br />Boundary. Based on OAR 660 - 023 -0250, Goal 5 is not applicable to the proposed amendments. <br />Goal 6 — Air, Water and Land Resources Quality. This goal requires local comprehensive plans and <br />implementing measures to be consistent with state and federal regulations on matters such as <br />groundwater pollution. <br />Finding #23. The Metro Plan Environmental Resources Element (Metro Plan pg. III -C -14) contains <br />polices addressing air, water and land resources quality. The proposed amendment to Chapter IV will <br />not alter the metropolitan area's air, water quality or land resource policies. Eugene and Springfield <br />have regulatory standards that protect air, water and land resources in their respective development <br />codes. The proposed amendments do not change these standards. <br />Metro Plan Chapter IV Amendments TYP411 -00001 Exhibit A <br />October 15, 2013 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.