Laserfiche WebLink
Step 4 - Identify Your Flood Control Plan <br />Identify where the stormwater runoff from new ore replaced impervious surface area(s) <br />will be discharged. Confirm that system has flood control capacity. For guidance evaluating <br />capacity, see Section 1.6 "Stormwater Flood Control" of this manual. <br />Step 5 - Identify Your Stormwater Quality Plan <br />Evaluate whether the site has infiltration potential. If the site cannot infiltrate runoff, <br />evaluate whether filtration treatment can be located on -site. Calculate the treatment facility <br />size(s) and locate facilities on the site plan of the proposed development. If there is <br />insufficient area for the treatment facilities, implement mechanical treatment. For guidance <br />on "Stormwater Quality ", see Section 1.7 of this manual. <br />Step 6 - Select Your Stormwater Facilities <br />Select and design an approved stormwater facility from those provided in Chapter 2 of this <br />manual. <br />Step 7 - Develop an Operation & Maintenance Plan <br />Applicants are responsible for on -going operation and maintenance of stormwater <br />facilities. Select and prepare an operation and maintenance plan as outlined in Chapter 4 <br />of this manual. <br />Step 8 - Technical Assistance <br />At any time during the planning, designing, or permitting process, you may contact the City <br />of Eugene for technical assistance. To request a consultation or speak with someone about <br />the stormwater development standards that apply to your project, call 541- 682 -5086. <br />Stormwater Management Manual 1 -14 <br />Eugene 2014 <br />