Laserfiche WebLink
Table 2 -1 Sizing methods and conformance with stormwater management standards for <br />each tacillty tune <br />Notes: Flow Control and Flood Control Credit are given when facilities are sized to accommodate design <br />events per the simplified and presumptive methods. <br />Stormwater Management Manual 2 -6 <br />Eugene 2014 <br />Facility <br />Sizing Approaches <br />Stormwater Management <br />Standard <br />Simplified <br />Presumptive <br />Water <br />Flow <br />Flood <br />Quality <br />Control <br />Control <br />Impervious Area Reduction Techni ues <br />2.3.3 <br />Contained Planter <br />X <br />X <br />2.3.4 <br />Eco roof <br />X <br />X <br />2.3.5 <br />Permeable <br />Pavement <br />X <br />X <br />2.3.6 <br />Tree Credit <br />X <br />X <br />Infiltration <br />Treatment Facilities <br />2.3.8 <br />Pond <br />X <br />X <br />X <br />X <br />2.3.9 <br />Rain Garden <br />X <br />X <br />X <br />X <br />X <br />2.3.10 <br />Sand Filter <br />X <br />X <br />X <br />X <br />X <br />2.3.11 <br />Stormwater <br />Planter <br />X <br />X <br />X <br />X <br />X <br />Filtration Treatment Facilities <br />2.3.7 <br />Filter Strip <br />X <br />X <br />X <br />2.3.8 <br />Pond <br />X <br />X <br />X <br />X <br />2.3.9 <br />Rain Garden <br />X <br />X <br />X <br />X <br />X <br />2.3.10 <br />Sand Filter <br />X <br />X <br />X <br />X <br />X <br />2.3.11 <br />Stormwater <br />Planter <br />X <br />X <br />X <br />X <br />X <br />2.3.12 <br />Swale <br />X <br />X <br />X <br />X <br />X <br />Mechanical Treatment Facilities <br />2.3.13 <br />Proprietary <br />Treatment <br />X <br />X <br />Devices <br />Source Control Devices <br />2.3.14 <br />Spill Control <br />Manhole <br />X <br />X <br />Detention Facilities <br />2.3.15 <br />Structural <br />-7 <br />Detention Facilit <br />X <br />X <br />Under round Injection Systems <br />2.3.16 <br />Dr ell <br />X <br />X <br />2.3.17 <br />Soakage Trench <br />X <br />X <br />Notes: Flow Control and Flood Control Credit are given when facilities are sized to accommodate design <br />events per the simplified and presumptive methods. <br />Stormwater Management Manual 2 -6 <br />Eugene 2014 <br />