My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-14-06
COE
>
City of Eugene
>
Administrative Orders
>
2014
>
Admin Order 58-14-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2014 11:24:27 AM
Creation date
10/14/2014 11:04:31 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
10/13/2014
Document_Number
58-14-06
CMO_Effective_Date
10/13/2014
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 4 - Identify Your Flood Control Plan <br />Identify where the stormwater runoff from new ore replaced impervious surface area(s) <br />will be discharged. Confirm that system has flood control capacity. For guidance evaluating <br />capacity, see Section 1.6 "Stormwater Flood Control" of this mahuai. <br />Step 5 - Identify Your Stormwater Quality Plan <br />Evaluate whether the site has infiltration potential. If the site cannot infiltrate runoff, <br />evaluate whether filtration treatment can be located on -site. Calculate the treatment facility <br />size(s) and locate facilities on the site plan of the proposed development If there is <br />insafficient area for the treatment facilities, implement mechanical treatment Forguidance <br />on "Stormwater Quality', see Section 1.7 of this manual. <br />Step 6 - Select Your Stormwater Fadlitles <br />Select and design an approved stormwater facility from those provided in Chapter 2 of this <br />manual. <br />Step 7 - Develop an Operation & Maintenance Plan <br />Applicants are responsible for on -going operation and maintenance of - stormwater <br />facilities. Select and prepare an operation and maintenance plan as outlined in Chapter 4 <br />of this manual. <br />Step 8 - Technical Assistance <br />At any time during the planning, designing, or per process, you may contact the City <br />of Eugene for technical assistance. To request a consultation or speak with someone about <br />the stormwater development standards that apply to your project, call 541 - 682 -5086. <br />5tonnwater Management Manual 1-14 <br />Eugene 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.