My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3 - PH/Ord. on Cell Towers
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-11/22/04Mtg
>
Item 3 - PH/Ord. on Cell Towers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:42:10 PM
Creation date
11/17/2004 12:20:16 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16,264 Lane code 16.264 <br /> <br /> (3) A0plication, Information a~n_d Processi~n~ Recmirements. A new or <br /> replacement telecommunication facility may be allowed provided an application is <br /> submitted for Director approval pursuant to' LC 14.050, the application complies with the <br /> requirements specified in LC 16.264(3)-(6) below, and provided the application is <br /> approved pursuant to the requirements of LC 14.300 for a hearing with the Director. <br /> Notice of the hearing shall be provided pursuant to the requirements of LC 14 and to the <br /> owners of property within one half-mile radius, of the exterior boundaries of the subject <br /> property and any property contiguous to and in the same ~wnership as the subject <br /> property. (Maintenance and repair of lawfully (per LC Chapter 16) existing uses and <br /> development is considered a permitted use.) <br /> (a) Prior to submission of an application, the applicant shall <br /> provide notice and hold a meeting with area property owners as required in <br /> LC 16.264(3)(a)(i)-(iii), below. The applicant shall submit evidence of the notification <br /> and meeting with the application. The application shall include evidence of compliance <br /> with this requirement. <br /> (i) The applicant shall, at least fourteen (14) days but not more <br /> than thirty (30) days in advance of the'meeting, mail notice of the meeting to property <br /> .owners and tenants living on property that would otherwise be notified pursuant to the <br /> requirements of LC 14.100 and to the applicable community organization recognized by <br /> the Lane County Board of Commissioners in Lane Manual 3.513 within the area in which <br /> the proposed site is located. The notice shall state the date, time, and location of the <br /> meeting and that the topic of the meeting is to discuss the proposed location of a <br /> telecommunication facility on the subject property and to hear from area residents about <br /> any concerns they might have with the proposal. The notice shall state the Lane County <br /> map and tax lot numbers for the subject property and the address for the subject property. <br /> (ii) The applicant shall, at least ten (10) days in advance of the ' <br /> meeting, publish notice of the meeting in a newspaper of general circulati°n serving the <br /> area. The published notice shall contain at least the same information as required by LC <br /> 16.264(3)(a)(i) above for the mailed notice. <br /> (iii) The applicant shall conduct a meeting within the general area <br /> of the proposed location of the telecommunication facility with the area property owners, <br /> tenants living on surrounding properties and interested parties to discuss the proposed <br /> application to allow community concerns regarding the proposed tower to be addressed. <br /> Nothing in this subsection limits the applicant from providing additional opportunity for <br /> input from area property owners and residents. <br /> (b) An application shall include the following information: <br /> '(i) A description of the proposed tower location, design and <br />· height. When the proposed tower location is Within 14,000 feet of an airport, the <br /> applicant shall show the tower height in relation to the imaginary surfaces for that airport <br /> and demonstrate that the tower does not penetrate those surfaces. <br /> (ii) The engineered design capacity of the tower in terms of the <br /> number and type of antennas it is designed to accommodate and constructed in such a <br /> manner as to optimize performance and minimize visual impact; <br /> (iii) Signature(s) of the property owner(s) on the application form <br /> or a written statement from the property owner(s) granting authorization to proceed with <br /> land use and building permit application; <br /> (iv) A signed statement from the property owner indicating <br />awareness of the removal responsibilities of LC 16.264(7)(d); <br /> (v) Documentation in the form of lease agreements for the <br />telecommunications facility that provide space for a minimum of three (3) users (the <br />primary user and two (2) collocation sites); <br /> (vi) Documentation of lease agreements with a Federal <br />Communications Commission (FCC) licensed provider; <br /> <br /> 16-456 'WI) l/c/O0056.Chapter16.250.264/T <br /> <br /> IV-124 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.