the conditional use permit application. In the event of'a conflict in criteria, the
<br /> criteria contained in subsections (6) and (7) of this section shall govern. No
<br /> development permit shall be issued prior to completion of the conditional use
<br /> permit process, including any local appeal.
<br />
<br />'(3) Collocation of Additional Antennas on Existing Transmission Tower;
<br />
<br /> (a) Permitted Use. Collocation of an additional antenna on an existing
<br /> transmission tower shall be considered an outright permitted use if property is
<br /> zoned GO, PL, $, C-2, C-3, C-4, I-1, I-2, or I-3 or if the transmission tower is in
<br /> any other zone and the city specifically approved, as part of a prior land use
<br /> process authorizing the transmission tower, collocation of additional antennas.
<br />
<br /> (b) Site Review. Collocation of an additional antenna on an existing
<br /> transmission tower shall be Subject to site review approval if property is zoned
<br /> AG, I:{-1, C-1 or PRO and approval for collocation was not granted through a
<br /> prior land use process.
<br />
<br />(4) Collocation of Antennas on Existing Buildings, Light or Utility Poles, and Water
<br />Towers. In addition to collocation on a transmission tower, an antenna may be collocated
<br />on existing buildings, light or utility poles, and water towers.
<br />
<br /> (a) Permitted Use. Such collocation on a building, light or utility pole, or water
<br /> tower, shall be considered an outright permitted use provided that the
<br /> antennas and ancillary facilities comply With the standards contained in EC
<br /> 9.5750 Telecommunications Devices-Siting Requirements and Procedures, the
<br /> color of the antennas blends in with the eXisting structure and surroundings,
<br /> and one of the following is met:
<br />
<br /> 1. The property is zoned PL, C-2, C-3, C-4, R-4, I-1, I-2, or I-3 and
<br /> the antennas do not exceed the height limitation of the zone; or
<br />
<br /> 2. The property iszoned AG, R-l, R-2,'R,3, C-1, GO, S, H, or PRO,
<br /> and the antennas extend no more than 18 feet above, and project
<br /> no more than 2 feet horizontally away from the existing structure.
<br />
<br /> (b) Site Review. Such collocation on a building, light or utility pole, or water
<br /> tower' shall be subject to site review approval provided that the antennas and
<br /> ancillary facilities comply with the standards contained in EC 9.5750
<br /> Telecommunications Devices-Siting Requirements and Procedures, the color
<br /> of the antennas blend in with the existing structure and surroundings, and:
<br />
<br /> 1. The property is zoned AG, R-l, R-2, R-3, C-1, GO, S, H, or PRO,
<br /> and the antennas extend more than 18 feet above, or project more
<br /> than 2 feet horizontally away from the existing structure.
<br />
<br /> (c) Conditional Use Permit. In all cases other than those listed in
<br /> subparagraphs (a) and (b), such collocation shall require a conditional use
<br /> permit. No exceptions to the standards contained in EC 9.5750
<br /> Telecommunications Devices-Siting Requirements and Procedures shall be
<br /> permitted except as authorized by subsection (9) of this section. In no event
<br /> shall a conditional use permit authorize a tower or antennas to exceedthe
<br /> height limitation for a zone as established by Chapter 9 except as provided for
<br />
<br />