My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3 - PH/Ord. on Cell Towers
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-11/22/04Mtg
>
Item 3 - PH/Ord. on Cell Towers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:42:10 PM
Creation date
11/17/2004 12:20:16 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Documentation that the ancillary facilities will not produce sound <br /> levels in excess of those standards specified in subsection (7)(f) of <br /> this section, or designs showing how the sound is to be effectively <br /> muffled and reduced pursuant to those standards. <br /> <br /> 5. Plans showing the connection to utilities/right-of-way cuts <br /> required, ownership of utilities and easements required. <br /> <br /> 6. Documents demonstrating that necessary easements have been <br /> obtained. ~ <br /> <br /> 7. Plans showing how vehicle access will be provided. <br /> <br /> 8. Signature of the propertY owner(s) on the application form or a <br /> statement from the property owner(s)'granting authorization to <br /> proceed with development permit and land use processes. <br /> <br /> 9. If ancillary facilities will be located on the ground, a landscape <br /> plan drawn to scale showing proposed and existing landscaping, <br /> including type, spacing, size and irrigation methods. <br /> <br /> 10. Documents demonstrating that the FAA has reviewed and <br /> approved the proposal, and the Oregon Aeronautics. Division has <br /> reviewed the proposal. Alternatively, when a site review or <br /> conditional use process is required, submit a statement <br /> documenting that notice of the proposal has been submitted to the <br /> FAA and Oregon Aeronautics Division. The site review or <br /> conditional use process may proceed and approval may be granted <br /> for the proposal as submitted, subject to FAA approval. If FAA <br /> approval requires any changes to the proposal as initially approved, <br /> then that initial .approval shall be void. A new application will need <br /> to be submitted, reviewed and approved through an additional site <br /> review' or conditional use process. No development permit <br /> application shall be submitted without documents demonstrating <br /> FAA review and approval and Oregon Aeronautics Division review. <br /> <br />(b) ConstrUction of Transmission Tower. In addition tO standard required <br />application material, an applicant for a transmission tower shall submit the <br />following information; additional application material is required, as specified in <br />paragraph (c) below, for apPlications requiring a site review or conditional use <br />process: <br /> <br /> 1. A description of the proposed tower location, design and height. <br /> <br /> 2. The general capacity of the tower in terms of the number and <br /> type of antennas it is designed to accommodate. <br /> <br /> 3. Documentation demonstrating compliance with nOn-ionizing <br /> electromagnetic radiation (NIER) emissions Standards as set forth <br /> by the Federal Communications Commission (FCC). <br /> <br /> 4. A signed agreement, as supplied by the city, stating that the IV-131 <br /> applicant will allow collocation with other users, provided all safety, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.