Laserfiche WebLink
Eugene .Code <br />~,. ' · color of the antennas blend in with the existing structure and <br /> surroundings, and: <br /> 1. The property is zOned AGi R-l, R-2, R-3, C-1, GO, S, H,-or PRO, <br /> and the antennas extend .more than 18 feet above, or project more <br /> than 2 feet horizontally away from the existing structure. <br /> (c) Conditional use Permit. In all cases other than those listed in <br /> , . subparagraphs (a) and (b), such collocation shall require a conditional <br /> .. use permit. No exceptions to the Standards contained in EC 9.5750 <br /> Telecommunications Device~i-Sitin,q Requirements and Procedures shall <br /> be permitted.eXcept as authorized by subsection (9) of this section. In- <br /> no event shall, a conditional use permit authorize a tower or antennas to <br /> exceed the height limitation fOr a zone as established by Chapter 9 <br /> except as provided for in this section. <br /> (5) Construction of Transmission TOwer. Construction of a transmission <br /> tower, or a modification of an existing transmission tower to increase its <br /> · height, shall be allowed as follows: <br /> (a) Permitted Use. <br /> ...- 1. Such construction or modification shall'be considered an outright <br /> .. permitted use in the C-4, 1,1, I-2 and I-3 zone.. <br /> 2. Modification to increase the height of an existing transmission <br /> tower shall be considered an outright permitted use in all other <br /> .zones if the city approved an increase in tower height, as part of a <br /> prior land use process authorizing the transmission tower. The <br />~--.~. increase in height allowed under this paragraph shall be limited to <br />,.. ~ i~ the specific height authorized in the prior land use process. <br /> <br />· (b) Site Review. Such cOnstruction shall'require site review approval, in the <br /> PL, C-2, and C-3 zones. <br /> (c) Conditional USe Permit. Such construction shall require a conditional <br /> GO zones. <br /> No new transmission tower shall be <br /> permitted in any zones ed in subparagraphs (a) to (c) above, <br /> including the AG, R-2, R~3, R-4,.H, NR, and PRO zones; or in the <br /> 'Willamette Greenway, on Gillespie Butte above the elevation of 450 <br /> feet, on the ddgeline·as defined in the South Hills Study or on Judkins <br /> Point. <br /> · (6) Application Requirements. <br /> (a) Collocation of Antennas. In addition to standard required application <br /> material, an applicant for cOllocation of antennas shall submit the <br /> ~ following information; additional application material is 'required, as <br /> specified in paragraph (c) below, for applications r~quiring a site review <br /> or conditional use process. <br /> 1. A description of the proposed antennas location,·design and <br /> · · height. <br /> 2. Documentation demonstrating compliance with non-ionizing <br /> electromagnetic radiation (NIER) emissions standards as set forth <br /> by the. Federal Communications Commission (FCC) particularly <br /> with respect to any habitable areas within the structure on which <br /> the antennas are co-locating on or in structures directly across <br />; "from or adjacent to the antennas. <br /> -- 3. A statement documenting that placement of the antenna is <br /> <br /> · . · 9-233 01/02/2004 <br /> <br /> I~¥11 <br /> <br /> <br />