Laserfiche WebLink
1'6.264 Lane Code 16.264' <br /> <br />(3) APplication, Information and Processing Requirements. A new or <br />replacement telecommunication facility may be allowed provided an application is <br />submitted for Director approval pursuant to LC' 14.050, the application complies with the <br />requirements specified in LC 16.264(3)-(6) below, and Provided the application is <br />.approved pursuant ti) the requirements, of LC 14.300 for a hearing with the Director. <br />Notice of the hearing shall be provided pursuant to the requirements of LC 14 and-to the <br />owners of property within one half-mile radiUS of the exterior boundaries of the subject <br />property and anY property contiguoUS to and in the same ownership as the subject <br />property. (Maintenance and repair of lawfully (per LC Chapter 16) existing uses and <br />development is considered a permitted use.) <br />(a) Prior to submission of an application, the applicant shall <br />provide notice and hold a meeting with area property owners as required in <br />LC 16.264(3)(a)(i)-(iii), below. The applicant shall submit evidence of the notification <br />and .meeting with the application. The application shall include' evidence of compliance <br />with this requirement. <br />(i) The applicant shall, at least fourteen (14) days but not more <br />than thirty (30) days in advance of the meeting, mail notice of the.meeting to property <br />owners and tenants living on property that woUld otherwise be notified pursuant to the <br />requirements of LC 14.100 and to the applicable community organization recognized by <br />the Lane County Board of Commissioners in Lane Manual 3.513 within the area in which' <br />the proposed site is located. The notice shall state the date, time, and location of the <br />meeting and that the topic of the meeting is to discUSs the proposed location of a <br />telecommunication facility on the subject property 'and. to hear from area residents about <br />any concerns they might have with the proposal. The notice shall state the Lane County' <br />map and tax lot numbers for the subject i~-~Operty and the address for the subject property. <br />(ii) The applicant shall, at least ten (10).days in advance of.the <br />meeting, publish notice of the meeting in a newspaper of general circulation serving the <br />area. The published notice shall contain at least the Same information as. required by LC <br />16.264(3)(a)(i) above for the mailed notice. <br />(iii) The applicant shall conduct a meeting Within the general area <br />of the proposed location of the telecommunication facility with the area property owners, <br />tenants living on surrounding properties and interested parties to discUSs the proposed <br />application to allow community concerns regarding the proposed tower to be addressed. <br />Nothing in this subsection limits the applicant from providing additional opportunity for <br />input from area property -owners and residents. <br /> (b) An application shall include the following information: <br /> (i) A description of the proposed tower location, design and <br /> height. When the proposed tower location is within 14,000 feet of an airport, the <br /> applicant shall show the tower height in relation to the imaginary surfaces for that airport <br /> and. demonstrate that the tower does not penetrate those surfaces. <br /> (ii) The engineered design capacity of the tower in terms of the <br /> number and type of antennas it is designed to accommodate and constructed in such a <br /> manner as to optimize performance and minimize visual impact; <br /> (iii) Signature(s) of the property owner(s) on the. application form <br /> or a written statement from the property owner(s) granting authorization to proceed with <br /> land USe and building permit application; <br /> (iv) A signed statement from the property owner indicating <br /> awareness of the removal responsibilities of LC 16.264(7Xd); <br /> (v) Documentation in the form of lease agreements, for the <br /> telecommunications facility that provide space for a minimum of three (3) users (the <br /> primary user and two (2) collocation sites); <br /> (vi) Documentation of lease agreements with a Federal <br /> Communications Commission (FCC) licensed provider; <br /> <br /> 16-456 WD l/c/00056.Chapter 16.250-264/T <br /> <br /> IV-22 <br /> <br /> <br />