Laserfiche WebLink
Exhibit C <br />Page 2of 3 <br />annexation may vary, annexation should occur as land transitions from urbanizable to <br />urban. (Page II-C-5) <br /> <br />The Metro Plandesignatesthe annexation areaas appropriate for residential use. The <br />River Road/Santa Clara Urban Facilities Plan (RR/SC UFP) is the adopted refinement plan <br />for the subject properties and also designates the area for residential uses. The property <br />is currently zoned AG/UL Agricultural with Urbanizable Land Overlay. The /UL overlay will <br />be automatically removed from the zoning following annexation approval. The applicant <br />plans to file a zone change application to low-density residential following approval of <br />the annexation. <br /> <br />With regard to applicable policies of the RR/SC UFP, the subject property is not within a <br />subarea; of the general “Residential Land Use Policies” at Section 2.2, none appear to be <br />directly applicable to the subject request. The “Public Facilities and Services Element” <br />policies of the RR/SC UFP are directedat local government; however, the premise of <br />these policies (regarding the provision of urban services)is the assumption that the <br />properties within the UGB will be annexed. <br /> <br />As previously discussed in this subsection, and further detailed under subsection (3) <br />below, the proposed annexation is consistent with Metro Plan growth management <br />policies and can be served by the minimum level of key urban services. The annexation <br />procedures beginning at EC 9.7800 are consistent with State law and therefore, as found <br />throughout this report, the annexation is consistent with State law. <br />EC 9.7825(3) The proposed annexation will result in a boundary in which the minimum level of key <br />urban facilities and services, as defined in the Metro Plan, can be provided in an orderly, <br />efficient, and timely manner. <br />Complies Findings: The proposed annexation will result in a boundary in which the minimum level <br />of key urban facilities and services can be provided in an orderly, efficient, and timely <br />YES NO <br />manner as detailed below: <br /> <br />Wastewater <br />Public wastewater is provided by an existing 8-inch main located within River Loop 1, <br />abutting the subject property to the west. <br />Stormwater <br />The roadside ditch along the west property boundary and River Loop 1 is intended for <br />road runoff only. Additional stormwater runoff from future development of the property <br />may require on-site detention and/or retention. Compliance with applicable stormwater <br />development standards will be ensured during the development permit process. <br />Streets <br />The portion of River Loop 1 abutting the west boundary of the subject property is under <br />Lane County’s jurisdiction. The need for any street improvements will be evaluated at <br />the time of development. <br /> <br /> <br />Olson (A 14-4) October 2014 Page 2 <br />