My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4814
COE
>
City of Eugene
>
Resolutions
>
2004 No. 4782-4819
>
Resolution No. 4814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:49:33 PM
Creation date
11/19/2004 10:26:13 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
11/8/2004
Document_Number
4814
CMO_Effective_Date
11/8/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 <br /> Data Documentation Summary <br /> <br /> concrete frame with <br /> site visit and architectural/engineering drawings <br />Building type (structural system) some reinforced <br /> concrete shear walls See Technical Appendix for details <br /> <br />Building construction date designed in 1962, <br /> built in 1964 City of Eugene and building engineering drawings <br /> <br />Number of stories 2 Site visit. Photos, Figures 2-3 to 2-7 in Technical Appendix <br /> <br /> parking level: 87,608 <br />Building square footage office level: 74,777 Engineering drawings and site visit <br /> total: 162,385 <br /> <br /> 1995 building replacement value (Dames & Moore), less value <br />Build~ng replacement value $27,774,330 of fire apparatus, adjusted to 2004 value <br />Building seismic damage function Building specific See report and Technical Appendix. Site visit, engineering <br /> fragihty curves analysis and engineering calculations <br /> <br /> Default value of 50% adjusted to reflect the seismic and <br /> Building demolition damage percent 40% functional deficiences of this 40-year old buildng, as per the <br /> FEMA guidance in User's Manual for Seismic BC Module <br /> Contents values <br /> Office contents $2,329,200 2003 insured value, which is $31.15/sf <br /> 1995 replacement value (Dames & Moore), adjusted to 2004 <br /> Fire apparatus $1,291,847 value <br /> Includes police and general (permit parking) vehicles. See <br /> Vehicles in parking area $2,985,600 ~nventory and value calculation in report. <br /> Total contents value $6,606,647 sum of above three contents categories <br /> FEMA Accept typical FEMA assumption that contents damage <br /> Contents seismic damage function typical/default values percentage is same as building damage percentage at each <br /> PGA level <br /> Displacement costs <br /> Estimate for Eugene office space after an earthquake event. <br /> Monthly rental costs per sf $2.00 Eugene has limited availability of office space of this square <br /> footage <br /> <br /> Other monthly costs: rental costs $50/space Estimate for Eugene, monthly cost for 194 spaces equals <br /> for secure parking spaces $9700 <br /> <br /> Estimated rental costs for temporary communications <br /> Other monthly costs $75,000 <br /> equipment and office furnishings <br /> <br /> One time costs $100,000 Estimated wiring, connecbon/disconnection costs for <br /> temporary communications equipment and moving costs <br /> various, see report City of Eugene staff and visitor data (March, 2004) <br /> Occupancy data and BCA flies <br /> <br /> Statistical values for deaths and <br /> FEMA 2004 values What is a Benefit? Guidance, adjusted to 2004 values <br /> injuries <br /> Engineering cost estimate; see report and Technical Appendix <br /> Mitigation Project Cost $1,435,382 for detailed breakdowns of cost elements <br /> Annual maintenance costs None No difference before and after m~tigation <br /> Relocation costs for mitigation None Assumes that retrofit can be done in stages, without vacating <br /> project the building. <br /> See detailed table in report, excludes pass-through amounts <br /> Annual Operating Budget $16,640,561 <br /> in Human Resources budget as per FEMA guidance. <br /> What is a Benefit? Guidance for commercial or public <br /> Mitigation Project Useful Life 50 years facilities, reasonable for this facility <br /> Discount Rate 7% OMB A-94 as per What is a Benefit? Guidance <br /> <br /> 7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.