Laserfiche WebLink
E~rthquake M~bgabon Project Version 5 1 December 31, 1997 <br /> <br /> ILEVEL TWO DATA: DISPLACEMENT TIME Page 6 I <br /> ~Eugene City Hall Eugene, Oregon I <br /> <br /> Analyst: ~K.A. Goettel 3118/04 IScenario Run ID:~01 I <br /> <br /> REFERENCE INFORMATION FROM LEVEL ONE DATA <br /> <br /> Rental Cost of Temporary Building Space ($/sf/month): $0.92 <br /> Rental Cost of Temporary Building Space (S/month): $149,554 <br /> Other Costs of Displacement (S/month): $84,700 <br /> Total Displacement Costs (S/month): $234,254 <br /> One Time Displacement Costs ($) $100,000 <br /> Total Monthly Rent from All Tenants (S/month): n/a <br /> DISPLACEMENT TIME DUE TO BUILDING SEISMIC DAMAGE BEFORE MITIGATION <br /> <br /> Building <br /> PGA Modified Default User-Entered Displacement Rental Income <br /> MMI (% of g) SDF (%) (days) (days) Costs Losses <br /> VI 4-8 2.56 0 $0 $0 <br /> VII 8-16 14.51 66.08 $615,983 $0 <br /> VIII 16-32 100.00 365 730 $5,800,181 $0 <br /> IX 32-55 100.00 365 730 $5,800,181 $0 <br /> X 55-80 100.00 365 730 $5,800,181 $0 <br /> Xl 80-100 100.00 365 730 $5,800,181 $0 <br /> Xll >100 100.00 365 730 $5,800,181 $0 <br /> <br /> DISPLACEMENT TIME DUE TO BUILDING SEISMIC DAMAGE AFTER MITIGATION <br /> <br /> Building <br /> PGA Modified Default User-Entered Displacement Rental Income <br /> MMI (% of g) SDF (%) (days) SDF (%) Costs Losses <br /> VI 4-8 0.02 0 $0 $0 <br /> VII 8-16 0.53 0 $0 $0 <br /> VIII 16-32 4.00 0 $0 $0 <br /> IX 32-55 11.17 39.36 $407,341 $0 <br /> X 55-80 22.97 134 $1,144,461 $0 <br /> Xl 80-100 36.13 239 $1,966,536 $0 <br /> Xll >100 100.00 365 730 $5,800,181 $0 <br /> <br /> DATA SOURCES AND DOCUMENTATION <br /> <br /> Accept FEMA typical/default values for displacement times, except for complete replacement <br /> of building. <br /> For building of this size and importance, consider two years (730 days) a minimum time to <br /> design/building a replacement building. <br /> <br /> Eugene C~ty Hall BCA 01 xls 3/22/2004 <br /> <br /> <br />