Laserfiche WebLink
Eugene City Hall R32.19.04 Rev. B. September 9, 2003 <br /> <br /> Figure 2-24. Transformer <br /> <br /> Figure 2-25 shows various paint buckets that are stacked. These present a falling hazard <br /> at Z---O. 15g or higher. While the value of the paints is relatively small, the spillage might <br /> result in slower emergency response times to perform other maintenance activities. These <br /> paint buckets could be stored in a suitable metal enclosure cabinet; and the cabinet should <br /> be suitably secured to the concrete floor. <br /> <br /> Figure 2-25. Paints <br /> <br /> Figure 2-26 shows two cabinets with backup power batteries. Inspection under the <br /> cabinets showed no positive anchorage to the floor below. Two more small electrical <br /> <br /> G&E Engineering Systems Inc. Page 20 <br /> <br /> <br />