<br />F acUity Process Comoonent <br />Biosolids <br /> <br />$2,894,000 <br />Total Cost <br /> <br />Costs <br /> <br />Design/Construction <br /> <br />FUNDING SOURCE <br />Capital Reserve <br />SDC Reimbursement Reserve <br />TOTAL <br /> <br />PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />PROJECT DRIVER: <br />PROJECT TRIGGER: <br /> <br />TYPE OF PROJECT: <br /> <br />ESTIMATED PROJECT COST <br />(FY 2004-05 Dollars): <br /> <br />RECOSTED PROJECT COST <br />(FY 2008-09 Dollars): <br /> <br />PHASING: <br /> <br />BIOSOLlDS - LINE LAGOONS II <br /> <br />TOTAL <br /> <br /> <br />2,744,000 <br />150,000 <br />2,894,000 <br /> <br />2,744,000 <br />150 000 <br />'.2.894,000 <br /> <br />Biosolids - Line Lagoons II <br />Reline lagoons, Phase 2 - from existing MWMC CIP. <br />Testing has indicated that the lagoons may be leaking. <br /> <br />Regulatory requirements and maintaining operational reliability. <br /> <br />Identification of temporary storage location for contents of lagoon and installation of <br />temporary equipment required to transfer lagoon contents. <br /> <br />100% Rehabilitation <br /> <br />$1,100,000 <br /> <br />$2,894,000 <br /> <br />Programmed for FY 2008/09 <br /> <br />Page 56 <br /> <br />FY 06-07 BUDGET AND eIP <br />