My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C: Ratification of MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 05/22/06 Meeting
>
Item 2C: Ratification of MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:34:09 PM
Creation date
5/18/2006 8:48:28 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/22/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Facility Process Component <br />Primary and Secondary <br />Treatment <br /> <br />$17,480,000 <br />Total Cost <br /> <br />Costs <br /> <br />Design/Construction <br /> <br />FUNDING SOURCE <br />apital Reserve <br /> <br />PROJECT: <br /> <br />DESCRIPTION: <br /> <br />JUSTIFICATION: <br /> <br />PROJECT DRIVER: <br /> <br />PROJECT TRIGGER: <br /> <br />TYPE OF PROJECT: <br /> <br />ESTIMATED PROJECT COST <br />(FY 2004-05 Dollars): <br /> <br />RECOSTED PROJECT COST <br />(FY 2006-07 Dollars): <br /> <br />PHASING: <br /> <br />.. <br /> <br />CLARIFIER IMPROVEMENTS <br /> <br />TOTAL <br /> <br /> <br />PRIOR <br />EXPEND- <br />ITURES <br />3130000 <br /> <br />3130,000 <br /> <br />17,480,000 <br />.......107'.480;000 <br /> <br />TOTAL <br /> <br />Clarifier Improvements (Originally Primary Clarifier Enhancements, Secondary Clarifier <br />Enhancements and 9th and 10th Clarifier) <br /> <br />Baffling of primary clarifiers and remove hydraulic restrictions. Baffle, add inlet energy <br />dissipation, change out flocculation well, construct outboard launder. and retrofit suction <br />header for existing 8 secondary clarifiers. Construct 9th and 10th secondary clarifiers. <br /> <br />Enhancing the existing clarifiers will increase primary and secondary treatment capacity <br />and will maximize the facilities investment in existing infrastructure. Adding the 2 new <br />clarifiers will increase secondary treatment capability and increase ability to handle peak <br />flows. <br /> <br />Increase capacity to treat base and peak flows and improve effluent quality and reliability so <br />that a blended primary and secondary effluent can meet the current NPDES total <br />suspended solids limits. <br /> <br />Primary clarifier surface overflow rates exceeding 1500 gpd/sf, or total plant influent flows <br />exceeding 86 mgd. Hydraulic restrictions removed when peak wet weather flows exceed <br />200 mgd. Average secondary clarifier surface overflow rates exceeding 750 gpd/sf or wet <br />season maximum month flows exceeding 80 mgd. Wet season flows through secondary <br />treatment exceeding 134 mgd. <br /> <br />Capacity and performance <br /> <br />$12,800,000 <br /> <br />$17,480,000 <br /> <br />Originally budgeted in FY 2004/05 and unspent amounts carried forward to FY 06/07 <br /> <br />Page 67 <br /> <br />FY 06-07 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.