Laserfiche WebLink
<br />Facility Process Component <br />Secondary Treatment <br /> <br />$10,189,680 <br />Total Cost <br /> <br />Costs <br /> <br />Design/Construction <br /> <br />FUNDING SOURCE <br />Capital Reserve <br />SDC Improvement Reserve <br /> <br />PROJECT: <br />DESCRIPTION: <br /> <br />JUSTIFICATION: <br /> <br />PROJECT DRIVER: <br /> <br />PROJECT TRIGGER: <br /> <br />TYPE OF PROJECT: <br /> <br />ESTIMATED PROJECT COST <br />(FY 2004-05 Dollars): <br /> <br />RECOSTED PROJECT COST <br />(FY 2006-07 Dollars): <br /> <br />PHASING: <br /> <br />... '4) .. <br /> <br />AERATION BASIN IMPROVEMENTS - PHASE 1 <br /> <br />TOTAL <br /> <br /> <br />. PRIOR <br />EXPEND- <br />ITURES <br />410000 <br /> <br />TOTAL <br /> <br />410,000 8,379,680 <br />1 ,400 000 <br />9,779,680 <br /> <br />8,789,680 <br />1 ,400 000 <br />10.189,6.80 <br /> <br />Aeration Basin Improvements Design and Construction - Phase I <br /> <br />Add step feed, anoxic selectors, and fine bubble diffusers to 4 of the 8 cells of the aeration <br />basins. Remove hydraulic restrictions in both south and north aeration basins (effluent <br />gates). Includes future primary effluent flow control gates for both north and south aeration <br />basins. <br /> <br />Increase the dry weather aeration basin treatment capacity to 65 mgd with respect to <br />ammonia (Le., with nitrification) and increase the sustained (Le., on a weekly basis) wet <br />weather treatment capacity to 130 mgd. <br /> <br />NPDES permit includes ammonia limit requiring nitrification in dry weather and expansion of <br />wet weather capacity to treat wet weather flows to meet NPDES monthly and weekly <br />suspended solids limits. <br /> <br />Maximum month dry weather flow of 25 mgd requiring nitrification. May flows and <br />temperatures could require the use of all aeration basin cells. Peak wet weather flows <br />above 103 mgd require hydraulic modifications. <br /> <br />50% Capacity; 50% Performance <br /> <br />$6,900,000 <br /> <br />$10,189,680 <br /> <br />Budgeted for FY 2004/05, carryover to FY 2005/06 and 2006/07 <br /> <br />Page 73 <br /> <br />FY 06-07 BUDGET AND CIP <br />