My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C: Ratification of MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 05/22/06 Meeting
>
Item 2C: Ratification of MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:34:09 PM
Creation date
5/18/2006 8:48:28 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/22/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ .. .. <br /> <br />Facility Process Component <br />Tertiary Filters <br /> <br />$14,685,000 <br />Total Cost <br /> <br />Costs <br /> <br />Design/Construction <br /> <br />FUNDING SOURCE <br />Capital Reserve <br />SDC Improvement Reserve <br /> <br />PROJECT: <br /> <br />DESCRIPTION: <br /> <br />JUSTIFICATION: <br /> <br />PROJECT DRIVER: <br /> <br />PROJECT TRIGGER: <br /> <br />TYPE OF PROJECT: <br /> <br />ESTIMATED PROJECT COST <br />(FY 2004-05 Dollars): <br /> <br />RECOSTED PROJECT COST <br />(FY 2008-09 Dollars): <br /> <br />PHASING: <br /> <br />TERTIARY FILTRATION I <br /> <br />TOTAL <br /> <br /> <br />13,285,000 <br />1 ,400 000 <br /> <br />o 13,285,000 <br />o 1 ,400 000 <br />1-4,685,000 <br /> <br />TOTAL <br /> <br />Tertiary Filtration Design and Construction <br /> <br />Filtration: includes infrastructure/support facilities for 30 mgd of filters; install filter cells <br />sufficient for only 10 mgd. <br /> <br />An estimated 30 mgd of filters is required by 2010 to meet dry season mass limits. Facility <br />Plan proposes phasing filters in sooner to facilitate development of Level 3 and Level 4 <br />reuse. Provides high quality secondary effluent and potential level 4 reuse water. Also, <br />needed to assist with meeting wet season mass load requirements during peak flow events <br />(under all peak flow management altematives). <br /> <br />Performance reliability to meet the dry weather NPDES total suspended solids limits of less <br />than 10 mg/L, reuse development, and compliance with peak flow management. <br /> <br />NPDE8 permit compliance for T88: Dry weather maximum month flow in excess of 49 mgd. <br />Also, initially to provide higher quality effluent so that reuse can be developed. <br /> <br />25% Capacity; 75% Performance <br /> <br />$10,100,000 <br /> <br />$14,685,000 <br /> <br />Programmed for FY 2008f09 <br /> <br />Page 76 <br /> <br />FY 06-07 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.