Laserfiche WebLink
<br />impact reductions) or to the City Engineer (for all other system impact reductions). <br />Calculation of impact reduction shall be based on the ratio of the system impact <br />with the program or facility in place, to the system impact if the program or facility <br />did not exist. <br /> <br />Prior to application of the impact reduction to the SDCs for the development, the <br />City shall receive assurances that will bind the developer, owner, and the owner's <br />successors as is necessary to ensure that the program or facility will function as <br />planned for the agreed upon time period. Such agreements may include, but are <br />not limited to performance bonds, maintenance programs, annual reports, <br />monitoring and inspections, or other pertinent items to document proper functioning <br />as determined by the City Engineer. <br /> <br />7.1.1 Transportation System Impact Reduction <br /> <br />For the transportation system, an impact reduction may be granted if the <br />applicant demonstrates to the satisfaction of the City Transportation <br />Engineer, that the improvement or program to be instituted in connection <br />with the development will materially reduce the number of automobile trips <br />the development will generate and that it will continue for at least twenty <br />years after the development is occupied. <br /> <br />7.1.2 Stormwater System Impact Reduction or Mitigation <br /> <br />For the stormwater system, an impact reduction may be granted based on <br />two forms of impact reduction: <br /> <br />, Destination and Quantity Reduction <br /> <br />r Pollution Reduction <br /> <br />These impact reductions will be granted after review and approval by the <br />City Engineer of the design documentation submitted in accordance with <br />standards specified in Eugene Code. 1971 section 9.6790 (3). Criteria for <br />stormwater SDC impact reduction for development can be found in <br />Appendix D. section 6.0. <br /> <br />physioal improvements whioh are privately oonstruoted as part of the <br />development. The applioant must demonstrate to the satisfaction of the City <br />Engineer that the improvements will materially reduGe the demand the <br />development 'NiII place upon the public stormwater drainage system and the <br />improvements will remain in use and f-unctional for at least tv.'enty years <br />after the development is ocoupied. (Note: Qualification for SDC stormwater <br />reduotion does not necessarily qualify oustomers for a reduction of the <br />monthly storm.....ater user servioe oharges whioh aro governed by the <br />Stormwater Service Charge Mothodology.) <br /> <br />7.1.2.1 <br /> <br />Storm'.vater System Impact Reduction Criteria <br /> <br />Criteria for stormwater SDC impaot reduction for development oan <br />be found in .^.ppendix D, section 6.0. A development that meets the <br />