Laserfiche WebLink
<br />FIGURE 2-EXISTING SYSTEM ALLOCATION <br /> <br /> <br />Reimbursement <br />Fee Cost Basis <br /> <br />TABLE 4 <br />Existing System Available Capacity by Parameter <br /> <br />Variable <br /> <br />Average Flow <br />(mgd) <br /> <br />49.0 <br /> <br />43.8 <br /> <br />5.2 <br /> <br />Peak Flow <br />(mgd) <br /> <br />175 <br /> <br />264 <br /> <br />BOD <br />(Ibs/day) <br />66.000 <br /> <br />54.800 <br /> <br />11.200 <br /> <br />TSS <br />(Ibs/day) <br />71.600 <br /> <br />64.700 <br /> <br />6.900 <br /> <br />Existing capacity <br />Current loading (current capacity required) <br />Available capacity (value) <br />Available capacity (%) <br />Source: 2004 Facilities Plan <br /> <br />None <br /> <br />10.5% <br /> <br />0% <br /> <br />17% <br /> <br />9.6% <br /> <br />1 The numbering of the steps for the existing system allocation process is preceded by an "R" to identify these steps as relating <br />to the Reimbursement Fee calculation. Later processes relating to the Improvement Fee calculation are indicated by an ".. in <br />the number sequence. <br />