My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4: Resolution Modifying Regional Wastewater SDC
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 05/22/06 Meeting
>
Item 4: Resolution Modifying Regional Wastewater SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:46:48 PM
Creation date
5/18/2006 9:28:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/22/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />model of the colIection system MWMC is able to estimate the current peak flow. DEQ <br />defines the peak flow as the peak hour or peak instantaneous flow that occurs during the <br />5-year, 24-hour storm (3.9 inches of rainfall). Under these rainfall conditions, the model <br />predicts a current flow of 264 mgd. Therefore, there is no available capacity in terms of peak <br />flow. Since the current average flow is 43.8 mgd, the current wet season III is 220.2 mgd <br />(264 less 43.8). <br /> <br />Using the projected future 2025 population and land use, the model predicts peak flows of <br />294 mgd without If I reduction efforts outlined in the 2000 WWFMP and 277 mgd with If I <br />reduction efforts outlined in the 2000 WWFMP. Therefore, it is estimated that the Ifl <br />reduction efforts will reduce III by approximately 17 mgd. <br /> <br />Wet season III in 2025 attributed to existing users is determined by subtracting the <br />anticipated reduction in wet season III (17 mgd) from the current wet season If I <br />(220.2 mgd) yielding 203.2 mgd. <br /> <br />Finally, wet season III attributed to growth in 2025 is 14.5 mgd and is determined by taking <br />the 2025 total peak flow projection of 277 mgd and subtracting both the 2025 average flow <br />(59.3 mgd) and the 2025 wet season III attributed to existing users (203.2 mgd). Therefore, <br />the peak flow in 2025 attributed to growth is 30 mgd (15.5 mgd of average flow plus 14.5 of <br />wet season III flow). <br /> <br />TABLE C.2 <br />Projected 2025 Peak Flow Breakdown <br /> <br />Average flow attributed to existing users (includes dry <br />season III) <br /> <br />Average flow attributed to future users (includes dry <br />season III) <br /> <br />Wet season III attributed to existing users <br /> <br />Wet season III attributed to future users <br /> <br />43.5 mgd <br /> <br />15.5 mgd (59.3 - 43.8) <br /> <br />Total peak flow <br />Total peak flow attributed to growth <br /> <br />203.2 mgd (220.2 - 17) <br />14.5 mgd (277 - 59.3 - 203.2 <br />277 mgd <br />30 mgd (15.5 + 14.5) <br /> <br />BOD <br /> <br />The methodology for BOD is similar to that of average flow. The existing capacity, although <br />not explicitly stated in the current NPDES permit, is 66,000 Ibsl day, which was the value <br />used for the original WPCF design. The current loading or current required capacity in <br />presented in DSMM terms is 54,800 lbsl day and is determined as follows: <br /> <br />Current BOD"" (0.185 x 217,737 x 1.3) + 2,402"" 54,800 lbsl day (actual calculated value of <br />54,756Ibsl day rounded to the nearest hundred pounds). <br />aWhere: <br /> <br />A.2iJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.