My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3 - URA/Design Fin. Agr
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-12/06/04Mtg
>
Item 3 - URA/Design Fin. Agr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:42:11 PM
Creation date
12/1/2004 2:42:46 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
12/6/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B - Description of the Patterson Street Underpass Project <br /> <br />The Patterson Street Underpass is planned as a two lane facility extending from Broadway to the <br />north side of the Union Pacific Railroad (UPRR). The roadway will provide two-way access and <br />be grade-separated at the UPRR and the planned Highway 99W. On the north side of the grade- <br />separated crossing of the UPRR, the roadway will extend west to a point at which the roadway <br />meets the existing ground elevation of the EWEB property. <br /> <br />Exhibit B - Description of Patterson Street Underpass Project <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.