|
201 ~ TO~'
<br /> CELL TOWERS 202
<br /> each bo qUalified professionals with a record of service to Details of the application process are ~peciflc to
<br /> municipalities in one of the. following fields: a) Great Barrington, and would need to be adapted to
<br /> teleco~licalfiom t~lgine~n~n8, b) I~rtlt:tural engin~ring, c) fit your local and state requirements. 14re require
<br /> monitoring of electroma~eti¢ fields, and, if determined
<br /> necessary by the SPi3A, d) other consultants, two different OIoes of permits because the first
<br /> B. The SP(3A shall select the Independent Consultant(s) at, er carrier, who may build a tower will need to get both
<br /> consultation with the Planning Board, the Board of Health, and a Tower permit and a Facility permit, but
<br /> the Conservation Commission, which may propose a list of subsequent carriers, co-locating on that Tower,
<br /> qualified candidates, need only get a Facifity permit. However, note that'
<br /> · Major Modifications also require new permits.
<br /> Because applications for these facilities (when they - B. Adequate Coverage, Adequate Capacity, and Justification
<br /> include e~ything they should) are voluminous and ~ of Need:
<br /> technical you need lo be able to hire independent 1 Applicant shall 'provide 'written documentation of any
<br /> con~ltant(s). The Applicant shouM pay for Facility Sites in Great Barrington, in abutting towns and
<br /> consal~ not the Town. This language allows in Mount Washington, MA, in which it has a legal, or
<br /> that to happert Again, note the reference to
<br /> M~ law and cixmge as necessary, equitable interest, whether by ownership, leasehold or
<br /> otherwise. From each such Facility Site, it shall
<br />VI § 171-12$.ProhtbitionofTeleP°rts: demonstrate with written documentation that these
<br /> · Facility Sites are not already providing, or do not have
<br /> There shall be no Teleport(s) within the Town of Great Barrington. the potential by adjusting the Site, to provide Adequate.
<br /> Teletm~ create a lot of radiation, are not protected COverage and/or Adequate Capacity to the Town of Great
<br /> Barrington. The documentation shall include, for each
<br /> in the Telecommunications AcC and you don't want Facility Site listed, the exact location (in longitude and
<br /> them anywherenearresidentialareas' latitude, to degrees, ·minutes and seconds), ground
<br />VII § 171 - 12~. Application Requirements: elevation, height of Tower or structdre, type of Amennas, -
<br /> A. No Tower or Personal Wireiess Service Facility shall be Antenna gain, height of Antennas on Tower or structure,
<br /> output frequency, number of channels, power input and
<br /> ere~ed, constructed, or installed without first obtaining a maximum power output per channel. Potential
<br /> Special Permit fi, om the SPGA. One or both of two kinds of
<br /> Special Permits am required; a)for new Tower construction (or adjustments to these existing Facility -Sites, including
<br /> changes in Antenna type, orientation, gain, height or
<br /> Major Modification Of An Existing Towe0; b) for Personal
<br /> Wh'eless Service Facilities (or Major Modification Of An power output shall be specified. Radial Plots from'each of
<br /> these Facility Sites, as they exist, and with adjustments as
<br /> Existing Facility)' to be mounted on an existing, or newly above, shall be provided as part of the ApplicatiOn.
<br /> permitted, Tower or structure. If Applicant is applying for beth 2. Applicant shall demonstrate with written documentation
<br /> Permits, they shall bo submitted and examined concurrently.
<br /> that they have examined all Facility Sites located in Great
<br /> Appli~ns shall .be submitted using the Long Form
<br /> ~ Application (SP-2), in accordance with. the requirements of Barrington, in abutting towns and in Mount Washington,
<br /> ? A,.lide X of tho Bylaw. The following additional information MA, in which Applicant has no legal or equitable interest,
<br /> ,o whether by ownership, leasehold or otherwise to
<br /> determine whether those.existing Facility Sites can be
<br /> ~ used to provide Adequate Coverage and/or Adeoz~te
<br />
<br />
<br />
|