Laserfiche WebLink
219 CELL TOWERS . CELL TOWERS 220 <br /> <br /> XI § 171- 130. M nitoringandEvaluati n fCompllance: of non-compliance. Failure to accomplish this reduction of <br /> A. Pre-testing: After the granting of a Special Permit and ~.r~i emission within 15 busineSS days of initial notification of non. ,~. <br /> Applicant's Personal Wireless Service · Facilities ' compliance shah be a violation of the Special Permit and <br /> trnnsmission, the applicant shall pay for an Independent subject to penalties and fines as specified in Article XH, §l?l- <br /> Consultant, hired by the Town, to Monitor the background' 65 of the Bylaw. Such fines shall be payable by the owner(s) of <br /> levels of EMF radiation, around the proposed 'Facility Site ,, the Facilities with Antennas on the Fncility Site, until <br /> and/or any Repeater locations to be utilized for Applicant's compliance is achieved.. <br /> Personal Wireless Service Facilities. The Independent D. Structural. Inspection: Tower Owner(s)shall pay for an <br /> · 'Consultant shall use the Monitoring Protocol. A report of the Independent Consultant (a licensed professional structural <br /> ... Monitoring results shall be prepared by the Independent engineer), hired by the Town, to conduct inspections of the <br /> . Consultant and submitted to the Board' of Selectmen, the Tower's structural integrity and safety. Guyed towers shaH be <br /> Planning Board, the Board of Health, the. Town Engineer, thc inspectcd cvcry three years. Monopoles and non-guyed lattice <br /> Building InsPeCtor and the Town Clerk. towers shall be inspected every five years. A report of the <br /> B. Post-testing: After transmission begins, the owner(s) of anY inspection results shaH. be prepared by the Independent <br /> Personal Wir, less Service Facility(s) located on any Facility Consultant and submitted to the Board of Selectmen, the <br /> Site shall pay for an Independent. Consultant, hired by the Planning Board, the Board of Health, the TOwn Engineer, the <br /> Town, to conduct testing and Monitoring of F, IViF radiation Building Inspector, and the Town Clerk. Any Major <br /> emitted fi-om said Site, and to report results of said Monitoring, Modification of Existing Facility which includes changes to <br /> as follows: Tower dimensions or antenna numbers or. type shall .require <br /> 1. There shah be routine annual Monitoring of emissions by new'structural' inspection. <br /> the Independent Consultant' using actual field E. Unsafe Structure: Should the inspcction of any Tower reveal <br /> measurement, of radiation, utilizing the Monitoring any structural defect(s) which, in the opinion of the <br /> Protocol~ This Monitoring shaH measure levels of EMF Independent Consultant render(s) that Tower unsafe, the <br /> radiation from the Facility Site's primary Antennas as following actions, must be taken. Within 10 business days of <br /> .. well as from Repesters~ (if any). A report of the notification of unsafe structure,' the owner(s) of the Tower shah <br /> Monitoring results shall be prepared by the Independent submit a plan to remediate the structural defect(s). This plan <br /> Consultant and submitted to the Board of Selectmen, shah be initiated within 10 days of the submission of the <br /> the Planning Board, the Board of Health, the Town remedintion plan, and completed as .soon as reasonably <br /> Engineer, the Building Inspector, and the Town Clerk~ possible. Failure to accomplish this remediation of structural <br /> 2. Any Major Modification of Existing Facility, or the defect(s) wi_th__i, 10 business days of initial notification shall be <br /> activation of any additional permitted'Channels, shall' a violation of the Special Permit and subject to penalties and <br /> require new Monitoring. fines as specified in Article XII, §171=65 of the Bylaw. Such <br /> C. F,,xcessive Kmissions: Should the Monitoring of a Facility Site fines shall be payable by the owner(s) of'the Tower, until <br /> reveal that the Site exceeds the FCC 96-326 standard, then the compliance is achieved. <br /> owner(s) of all Facilities utilizing that Site shall be so notified. <br /> The owner(s)shaH submit to the SPGA and the Building XII..§ 171- 1;~1. Removal Requirements: <br /> h~p~tor a plan for the reduction of emissions tea level that Any Personal Wireless Service Facility which ceases to operate for <br /> · complies with the FCC 96-326 standard within 10' business a period of one year shall be removed. Cease to operate is defined <br />. .day..of.o n o. of.o.compli , shal, duce' as not p-fo -.S tho no. d f.. ons ,o ted tho <br /> <br /> ,. .~.-'qmss~ons to the standard within 15 days of initial notification Personal Wireless Service Facility and its equipme ~ ~on a <br /> <br /> <br />