My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 6 - PH/Cell Towers
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-12/06/04Mtg
>
Item 6 - PH/Cell Towers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:55 PM
Creation date
12/1/2004 2:43:15 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
12/6/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i6"264, Lane Code 16.264 <br /> (vii) Dooumentation demonstrating that the Federal Aviation <br />~i )' . Administration (FAA) has reviewed and commented on the proposal, and the Oregon <br /> . Department of Aviation has reviewed and provided comment on the proposal. <br /> (viii) Plans showing how vehicle access will be provided and <br /> documents demonstrating that necessary easements have been obtained'; and <br /> (ix) Other information requested in the application form provided <br /> by the Director, such as but not limited to, peer review by an independent engineering <br /> firm of the proposed telecommunications facility system design. <br /> (e) . The applicant shall identify all existing towers, or properties that <br /> have obtained approval for a tower within ten (10) miles of the proposed tOwer location. <br /> The applicant shall provide evidence that collocation at all existing or approved towers <br /> · within ten miles is not feasible, and provide documentation for locating a new tower, <br /> based on either of the following: <br /> (i) Lack of useable and compatible collocation space; <br /> (ii) Inability to meet service coverage area and capacity needs; or <br /> (iii) Technical reasons such as channel Proximity and inter- <br /> ·modulation. <br /> (d) The tower shall comply With all required State of Oregon and <br /> Federal licenses for telecommunication tower facilities. The application shall include a. <br /> certification that the completed installation will comply with all Federal, state and local <br /> standards. The applicant shall submit documentation demonStrating compliance with non- <br /> ionizing electromagnetic radiation (NIER) emission standards as set forth by the Federal <br /> Communications Commission (FCC). <br /> (e) 'Factual information addresSing compliance with requirements in LC <br /> '16.264 (4) and (5), below. <br /> (4) Collocation Requirements for Telecommunication Facilities. Collocation <br /> ') of a telecommunications facility on an existing structure or building is not subject to the <br /> land use application and approval provisions of LC 16.264 (3). However, collocation, of <br /> a new or replacement telecommunication facility may be allowed provided a land use <br /> application is submitted pursuant to LC 14.050 and approved pursuant to LC 14.100. <br /> The application for collocation may be allowed provided the'requirements in LC <br /> 16.264(4)(a) and Co) are met. <br /> (a) An application for collocation of a new or replacement <br /> telecommunications facility shall provide the information required in LC 16.264(3)CO)(i)- <br /> (ix) and (d). <br /> (b) Factual information addressing compliance with requirements in LC <br /> 16.264 (5) and (6), below. <br /> (5) Siting Standards for Height, Setbacks and Access to Telecommunication <br /> ..Facilities. The following standards shall apply to all new or replacement telecommuni- <br /> cation facilities. <br /> (a) Consideration shall be given to other sites in the service area that <br /> w~uld have less visual impact than the site proposed as viewed from nearby residences <br /> and that the applicant has demonstrated.that less intrusive sites ar.e not available or do not <br /> provide the communication coverage necessary to provide the service. Visual impact can <br /> be measured by techniques including, but not limited to, balloon tests and photo <br /> simulations. <br /> CO) Telecommunication facilities shall be limited to the height necessary <br /> to provide the serVice, not to exceed 200 feet in height from ground level. <br /> (c) Directional / parabolic antennae shall be selected to optimize <br /> Performance and minimize visual impact. <br /> (d) The setbacks for a tower shall be the setback otherwise allowed for <br /> · all other structures in the zone except that: <br /> <br /> 16-457 WD l/c/O0056.Chapter 16.250-264/T <br /> IV-23 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.