Laserfiche WebLink
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP <br /> -- as of Dec 1, 2004 -- <br /> Fiscal Year <br /> <br /> ODOT FY05 FY06 FY07 Total RTP Regional NOTES <br /> <br /> Project Project Description Key i i Total Cost Federal Funding Project Emissions Modifications to FY(M- New Can be amended <br /> Number Federal $ ] Other $ Federal $ i Other $ Federal $ i Other $ FY05-07 Cost FY05, Source Number~ Analysis 06 MTIP to get to Draft Project? administratively <br /> ........... ^ ~ ..... t~.~; ~.~..~ ......... .~..^.~.~ ~ LTD request to change <br /> ~A~;~. ........ .~ .... ~ .......... . ................... Federal NO <br /> .................... ~ A~ +~.~ .~ ......... .~ ...... .~, i i TSI Transit Not in CATS name and description <br /> Opcrc*Jc~c Fac!I!."/ ........................... ~ ...... 13445 ~1.879,152i ~;21~,077i $2,094,229 $1,879,152 5307, NO (must be adopted <br /> ~^...~^~ ,^. k.cD^ .... .~ Policy #1 Area and add additional by MPC) <br />RideSoume Facility ......................... . ........ i j 5309 FY05 funds <br />Construction Prelect .:.~,T~.~.~+~.-[~.~.~'+~.~.'~r~ ;~""~'~'~'~"~'~' <br /> ............ .;:. '.:-£ .:':: 'J ~ :, :' '-~ ......... <br /> (~onstruction of RideSoume <br /> maintenance and operation facility; 2nd <br /> {~nd Garfield, <br />Bus Support This project includes office supplies, 12254 i Federal TSI Transit Not in CATS LTD request to add NO <br />Equipment and computer hardware and software, and 12257 $2 800 000i $700,000 ~800,000i $200,00(; $800,000~ $200,00¢ $5,500,000 $4,400,000 5307 Policy #1 Area additional funding for NO (must be adopted <br />Facilities other administrative support equipment. TBD i i ! FY06, FY07 by MPC) <br /> Five vehicles are being pumhased for <br /> the Franklin EmX corridor. These ! i <br /> vehicles are hybdd electric vehicles, i i Federal Not in CATS <br /> and will replace diesel-powered 12251 [ 1110 <br />Bus Rapid Transit vehicles operating in existing service on 13446 [ $5 280 000i $1,320,00¢ $6,600,000 $5,280,000 5307 Area <br />Vehicles <br /> this corridor, served by the number 11 <br /> route. The number 11 route will be <br /> replaced by the Franklin EmX Corridor <br /> Service. <br /> Phase One of Bus Rapid Transit, also <br /> referred to as the Franklin EmX <br /> Corridor, is a four-mile corddor from <br /> downtown Eugene to downtown <br /> Springfield, The EmX service will <br /> provide rapid transit service through <br /> exclusive busways, Iow-floor vehicles, <br /> pre-paid fare mechanisms, and signal Federal <br /> i 5309, 1115 Required <br />Bus Rapid Transit, priority. This service will replace 13285 $8,000 0001 $2.000.000 $10,000,000 $8,000,00~ Federal <br />Phase One existing service, with the same <br /> frequency, currently provided by the i 5307 <br /> number 11 route. Due to pdodty <br /> techniques such as exclusive busways <br /> and traffic signal priority, as well as <br /> hybrid-electric vehicles, it is anticipated <br /> that emissions for the EmX Franklin <br /> Corridor will be less than the existing <br /> conditions. <br /> <br /> Page 7 of 10 <br /> Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December 1, 2004 <br /> <br /> <br />