Laserfiche WebLink
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP <br /> -- as of Dec 1, 2004 -- <br /> Fiscal Year <br /> <br /> ODOT FY05 FY06 FY07 Total RTP Regional NOTES <br /> <br />Project Project Description Key i i i Total Cost Federal Funding Project Emissions Modifications to FY04- New Can be amended <br /> Number Federal $!i Other $ Federal $ ii Other $ Federal $ ]] Other $ FY05-07 Cost07FY05, Source Number~ Analysis 06 MTIPFY05.07to getMTiptO Draft Project? admlnistrativelYby TPC? <br />EUGENE, Continued ~ <br />Jude!nc Pc!~t <br /> ........... / .................. ~' .............. ~i i $0 $~ E-r-L-G ~ ............ FY04 project <br /> <br />G!cn.;:c _.c~_ __.c,-!.~,.,~_rd ............ ~ ...... . ............ . .......... , i P-eiic. y-,~l- ..... <br /> i __ NO <br /> Judkins Point Intersection imorevements at i i TSI Not in CATS New project. YES (must be adopted <br /> Interchanee / TBD i $220,00( ~ $220,000 ~ E, LC Roadway_ Area Additional/new funding. <br />Glenwood Boulevard interchanoe ramo terminal [South sidel -- i i ~ by MPC) <br /> Extension of Legacy Street; Construct 13392 i i ; Not in CATS <br /> Legacy Extension, new 3-lane major collector with curb, 13393 i $263,00(i $823,00( i $1,086,000 $(~ E 445 Area <br /> Avalon to Royal gutter, sidewalks and bike lanes 13394 <br /> Infrastructure improvements to support <br /> new development; This category is 13395 ii Not in CATS <br /> Services for New used as match for capital projects 13396 i $400,00( $400,00£ $800,000 $(~ E 102 Area <br /> Development which add capacity to respond to 13397 <br /> demand from new development <br /> Enhance Monroe/Friendly corridor to <br /> make it a 'bike arterial;' Project still in <br /> planning/scoping phase; May include <br /> Monroe Street / bike lane or route on either Monroei i i Not in CATS <br /> Fdendly Street Street or Friendly Street between Ruth 13399 $224 000~ $26,00(; i! $250,000 $224,00(~ STP-U, E 172, 251 Area <br /> Bikeway Biscom Riverbank Trail and 28th <br /> Avenue. Possible intersection and <br /> operational changes to improve safety <br /> for cyclists through corddor <br /> North Bank Trail Rehabilitate the existing pavement of <br /> Resurfacing: North Bank Trail path by overlaying witt' Finance Not in CATS <br /> Greenway Bicycle new concrete surfacing, Greenway 13400 $381,000i $96,00(; i ,$477,000 $381,000 STP-U, E Policies #2 Area <br />Bridge - 1500' East Bicycle Bddge to 1500' east of Hwyi & #6 <br />of Hwy 227 227 [1105] O-Xing. <br /> Extension of Roosevelt Bid; Construct <br />Roosevelt Extension 13401 i Not in CATS <br /> new 3-lane major collector with curb, 13402 $270,00(~ $274,000i $544,000 $0 E 429 Area <br /> Terry to Royal gutter, sidewalks and bike lanes <br /> Rehabilitate the existing pavement of <br /> Garden Way Path Garden Way path (Garden Way to 13403 i $388,000ii $97,000i $485,000 $388,000 STP-U, E TSl Bikeway Not in CATS <br /> Resurfacing Canoe Canal)concretebY overlayingsurfacing with newi i Policy #1 Area <br /> Extend Chad Ddve to connect to North <br /> Game Farm Road, including 2 travel <br /> i Not in CATS <br /> Chad Drive lanes, center turn lane at intersections 13404 $695,0001 $565,000 $1,260,000 $695,000 STP-U, E 680 <br /> Extension curb, gutter bike lanes and sidewalks i Area <br /> on both sides, street trees, street lights, <br /> and a traffic signal at Game Farm Road <br /> City of Eugene request <br /> Realiqn Airport Rd and possible i i Not in CATS for new project. Projecl NO <br /> Airport Road reconficuration of Aimort Rd/Greenhill TB_.._~D $180,000i $20,000 $2.081,8201 $118.180 ~ $2,261.820 FAA. E 499 YES (must be adopted <br /> Realiqnment Rd airport entrance intersection, i i -- Area is inMasterCity's PlanAirp°rt by MPC) <br /> Extend Patterson St. from Broadway to <br /> <br /> Patterson Street North of Railroad Tracks and Construct ! } i In CATS area City of Eugene request NO <br /> Underoass TB.~D ] i $3.570.000 i $8,330.00C $11,900,000 $0 E 19._.~9 Required for new project. YES (must be adopted <br /> Undereass FY06: preliminarv desion & eneineedn(]= , by MPC) <br /> FY07: construction <br /> <br /> age 2 of 10 <br /> Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December I, 2004 <br /> <br /> <br />