Laserfiche WebLink
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP <br /> -- as of Dec 1, 2004 -- <br /> Fiscal Year <br /> ODOT FY05 FY06 FY07 Total <br /> Project <br /> RTP Regional NOTES <br /> Project <br /> Description <br /> Key <br /> Total <br /> Cost <br /> Federal <br /> Funding <br /> i i Other $ Project Emissions , Modifications to FY04- New Can be amended <br />  Number Federal Si Other $ Federal Si Other $ Federal $! FY05-07 Cost FY0$ Source <br /> ]' i i 07 Number~ Analysis 06 MTIP to get to Draft Project? administratively <br /> FY05-07 MTIP by TPC? <br /> Reconstruction and urban standards A <br /> Street to Thurston Road; Upgrade to a <br /> three lane section where feasible <br /> including sidewalks, curbs and gutters, <br /> 69th Street drainage improvements for a channel 13426 i $431,000] $754,000 i $1,185,00(3 $431,000 STP-U, S Finance Not in CATS <br /> (drainage funds), bike lanes, street !i Policy #2 Area <br /> lighting, intersection improvment (signal <br /> or roundabout) at 69th and Thurston <br /> intersection <br /> Gatewav/Beltline <br /> Intersection Desiqrl and Ri(iht of Way oumhase TB.__.~D i $2,250.00(; i $3,250,00(3 i $2,500,00(; $8,000.000 $0 S,D 789 Not in CATS Springfield request; NO <br /> ~ Area new project YES (must be adopted <br /> <br /> E..~c.~c!c.'~, .M.c~n E."t. cnd d !"nc =.'tcdal ! 3d27 I ~"ct !n CATS <br /> Str-~ct tc 5.%~ j $0 $0 L--G ~ ~ FY04 <br /> project <br /> i ! ' Lane County request to YES <br /> Jasper <br /> Road <br /> i move existing funding (moving projects <br /> Extensi°n'57tht°Jasper Road Extend21aneartedal 13428 i $2,625,00( i $2,625,000 NotinCATS <br /> i to FY05 and change NO between years <br /> i $0 LC 66 Area extent to 57th St. from within MTIP <br /> i pedod is <br /> j 58th St administrative) <br /> Intemhange improvements; Intedm YES <br /> Delta/Beltline safety improvements; potentially i Lane County request to (moving projects <br /> Intemhange replace/revise existing ramps and 10088 j $8,050,000 $8,050,000 $0 LC 638 Not in CATS <br /> between <br /> widen Delta Highway bddge to five i Area <br /> move <br /> exiating <br /> funding <br /> years <br /> NO <br /> within <br /> MTIP <br /> lanes i i~ i from FY05 to FY06 period is <br /> Upgrade from 2-lane to 3-lane urban i i i admini~iaiive) <br /> facility; include a curb, setback <br /> sidewalk, urban bike lane on the <br /> Game Farm North south/west side and a rural design on <br /> <br />Eugene City Limit to the nortWeast side including a six foot, ii Lane County request to <br /> <br /> Coburg Road bike shoulder; include a new traffic 13430 j $3,025,00C i $3,025,000 $(3 LC 654 Not in CATS ,ncrease amount from NO <br /> signal at Crescent Avenue and an~ Area $2,200,000 to NO (must be adopted <br /> ! $3,025,000 by MPC) <br /> ~mprovement of the Armitage Road .." <br /> alignment as the fourth leg of this <br /> intersection <br /> · .c".:g~ment .................................. g i i i Lane County request to YES <br /> ............... ' ............ ' ....i ' .......i i Net !n CATS remove project from (removal of local <br /> A;'cn'.'e ,^ ~n"~ a ..... ,~.. c,.~. ~.~.. r~,~ . j ..... MTIP (project dropped project is <br /> ,.~m~ ~,g~,. ^,.~ ~..,~^~ ~, ~,.w%.] i from County CIP) administrative) <br /> H!gh...:cy :;,!!! bc ~--b".~.dc~cd or <br /> <br /> C~ntral I~nc MPO DRAFT F¥2005o2007 MTIP Proje..et Table ~ge 4 of 10 <br /> D~ember 1, 2004 <br /> <br /> <br />