My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-15-17-F
COE
>
City of Eugene
>
Administrative Orders
>
2015
>
Admin Order 58-15-17-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 2:25:06 PM
Creation date
6/25/2015 2:21:56 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
6/25/2015
Document_Number
58-15-17-F
CMO_Effective_Date
7/1/2005
Author
CRO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 6 <br />Local Wastewater System Development Charge Analysis <br />1. Analysis of System Value <br />Total Replacement Cost - Pipe <br />$601,214,583 <br />Total Replacement Cost - Pumping Stations <br />$22,951,310 <br />City Cost of future projects within UGB <br />$14,371,573 <br />Other Wastewater Components <br />$4,710,904 1. <br />Total Cost of Existing Wastewater System <br />$643,248,370 <br />2. Analysis of Assessable Amount <br />Size <br />Total Cost <br />6 -inch <br />$13,660,263 <br />8 to 48 -inch <br />$454,559,002 <br />Total Assessable Cost <br />$468,219,265 <br />3. Capacity Information <br />Total City System Capacity in mgd 49.0 <br />4. Calculation of Wastewater SDC <br />Total System Valuation, existing and planned <br />$643,248,370 <br />Cost per unit of capacity per gallon <br />$3.2682 <br />Residential Rate Structure <br />$431.40 per RDU + $0.1045 per sq. ft. of living area <br />Non -Residential Rate Structure <br />I See Table 7 <br />5. Calculation of Reimbursement Percentage <br />City System Capacity (EDUs) in mgd <br />49.0 <br />100.00% <br />Existing Use in mgd <br />21.4 <br />43.7% <br />Percent Available for New Development in mgd <br />27.6 <br />56.3% <br />Total Value of Reserve Capacity (value of system) <br />$89,951,098 <br />100.00% <br />Value of Increased Capacity (cost of future projects UGB- Master Plan) <br />$14,296,940 <br />15.98% <br />Value of Reimbursable Capacity (previously paid value -existing users) <br />$75,579,655 <br />84.02% <br />Page 4 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.