Laserfiche WebLink
B. WORK SESSION: Grade-Separated Ramp Connections for the I-5/Willamette River Bridge <br /> <br />City Engineer Mark Schoening joined the council for the item. He noted that Lane County Area Manager <br />Bob Pirrie, Mr. Boyatt, Project Leader Ann Sanders, and Project Environmental Manager Susan Vickers <br />of ODOT were also present for the item. Mr. Schoening referred to the planned Interstate 5 Willamette <br />River Bridge replacement project and the proposal made by Springfield Mayor Sid Leiken and Mayor <br />Torrey to include ramp connections from Franklin Boulevard. He said that in such projects, ODOT had <br />an expectation of local resources from local governments for transportation system planning and <br />engineering support. ODOT would do most of the technical work needed to implement the project. The <br />City's Public Works Department had some flexibility to adjust its work plan to shift the project to a higher <br />priority and the Planning Division had some funding to address emerging issues. <br /> <br />Mr. Schoening noted the letter provided to the council from ODOT Planning Manager Jack Lee to mayors <br />Torrey and Leiken. The letter was to clarify ODOT's commitment to consider grade-separated ramp <br />connections between the planned I-5 replacement bridge and Franklin Boulevard. <br /> <br />Mr. Pirrie emphasized ODOT's directive to complete land use planning for projects prior to engaging in <br />the National Environmental Policy Act (NEPA) process. He offered several examples of ODOT projects <br />that implemented the directive. Mr. Boyatt added that ODOT had experienced challenges back loading <br />land use and planning at the end of a NEPA process. The directive ensured that ODOT had a technically <br />legitimate project from a transportation system operations standpoint. All environmental red flags were <br />identified in the process, and ODOT ensured that it had local support for the project prior to making the <br />investment in the technical project development phase. Mr. Boyatt distributed the first two pages of a <br />work order contract for the I-5 Willamette River Crossing developed by ODOT in consultation with its <br />consultant, CH2M Hill, to ensure the systems planning work was addressed to demonstrate how the <br />process worked. <br /> <br />Mr. Boyatt acknowledged the commitment made by ODOT to the local community in regard to the <br />project. He said that ODOT had moved the project to the "front burner" and had managed to identify <br />about $180,000 in available funding to spend between now and June 30, 2005, with another $200,000 <br />proposed for the upcoming biennium to complete the work needed. He said that ODOT needed the <br />elected and appointed officials as well as local staff to be "on board" for the project. <br /> <br />Mayor Torrey solicited questions. <br /> <br />Ms. Bettman said she would like to see a price tag for the local systems planning effort. She endorsed <br />ODOT's decision to complete land use and planning prior to going through the NEPA process. She asked <br />what the City's public involvement process for the project would look like and how it would be funded. <br />Ms. Bettman wanted to see a proposal come back in a form the council could endorse. <br /> <br />Ms. Bettman asked if separated grade connections referred to flyovers. Mr. Pirrie said that could be an <br />alternative considered. <br /> <br />Responding to a question from Ms. Bettman, City Manager Taylor indicated the council would have <br />several opportunities to discuss the project. <br /> <br />Mr. Kelly was supportive of the concept of a full interchange at the location in question. However, he <br />was concerned by the letter from Mr. Lee because it lacked detail about the public process envisioned <br />during the "non-NEPA" phase of the project. Mr. Kelly recommended the use of a stakeholders group <br />similar to that used for the Beltline/I-5 project to ensure a project design that worked from a transportation <br /> <br />MINUTES--Eugene City Council November 17, 2004 Page 5 <br /> Work Session <br /> <br /> <br />