My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
monumentation, a formal survey shall be filed with the Lane County Surveyor and a copy <br />provided to the City Surveyor. <br />B. As -Constructs <br />Within 30 days after receiving the inspection notes from the City Inspector, the Project <br />Engineer shall submit both a reproducible copy and an electronic version of the <br />completed as -construct drawings for the project. Changes noted during construction and <br />field measurements indicated on the inspection notes shall be included. See Section 5 for <br />as -construct requirements. Failure to submit as -construct drawings shall suspend review <br />of other work submitted by the responsible firm for the project until as -construct work is <br />completed. <br />C. Project Completion Notice (Beginning of Warranty Period) <br />When all work shown on the approved plans has been completed and has met the final <br />inspection criteria outlined in the specifications, the City Engineer shall send a letter to <br />the Project Engineer, with a copy to the Contractor and Owner/Developer, confirming <br />completion of public improvements for City maintenance and commencement of the <br />warranty period. <br />D. Project Acceptance (Release Performance Financial Surety) <br />After the City's warranty inspection has been completed, required repairs have been <br />completed by the Contractor, centerline and right-of-way monumentation has been set <br />and accepted, as -construct plans have been submitted to the City and accepted, and all <br />charges have been paid, the City will issue a Final Acceptance Letter. Copies of the Final <br />Acceptance Letter will be distributed to the Contractor, the Project Engineer, the City <br />Finance Division, and the owner/Developer's bonding company. At this time, the City <br />Engineer may authorize release of the financial surety. Service connections will not be <br />permitted until the public system has been accepted by the City. <br />4.16 FAILURE TO COMPLY WITH CITY STANDARDS AND PROCEDURES <br />In, the event the Project Engineer fails to adhere to requirements and/or schedules listed <br />herein, the City Engineer may postpone review of other submitted work until the deficiencies <br />are corrected. Failure to complete as -construct work within the time requirements shall <br />postpone review of other work. <br />Public Improvement Design Standards Manual, 2016 Page 4-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.