My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comment 2: The definition of "Perimeter Control" allows no stormwater to leave the <br />site in a five-year storm event. This seems unreasonable. Is the correct reading of the rule <br />that they only apply perimeter control measures to stockpiled material? <br />Findings_ Perimeter controls are an option available to protect both exposed soils and <br />stockpiles, butperimeter controls are not the only option During the wet weather season all <br />exposed soil and stockpile areas not protected byperitneter control must be covered. During <br />the non-wet weather season soils and stockpile areas cannot be exposed to precipitation or <br />stormwater runoff without the provision ofsecondary containment, perimeter controls and <br />other approved BMPs. Thus, during the wet-weatber season exposed soils and stockpile <br />areas must be covered, which is our preferred BMP, or other measures must be taken so that <br />no runoff leaves the sitd during any storm events up to a five-year storm, i.e., perimeter <br />controls. During the non-wet weather season the applicant has more options to choose from. <br />They could cover. all soils, provide secondary treatment, which include both a preventative <br />measure and a control measure, or not allow runoff to leave the site during any storm: event <br />up to a five-year storm No changes were made to this rule as a result of this comment. <br />Now, therefore, based on the findings in Administrative Order No. 58-03-01. and the above <br />findings, which are hereby adopted, and pursuant to the authority contained in Sections 2.019 and <br />6.645 of,the Eugene Code, 1971, I hereby repeal Administrative Order No. 58-00-26-F as of the <br />effective date of this Order, and adopt the Erosion Prevention and Construction Site Management <br />Practices Administrative Rule 6.645, to provide as.follows: <br />EROSION PREVENTION AND CONSTRUCTION SITE <br />MANAGEMENT PRACTIC.'ES ADMINISTRATIVE RULE R-6.645 <br />R-6.645-A Purpose and Intent. <br />1. Purpose. These rules implement Sections 6.625 to 6-.645 ofthe Eugene Code, 1971, <br />which were adopted to restrict the discharge of sediments or other construction related materials, <br />including hazardous substances, into the City's stormwater system in order to: <br />1.1 Prevent or minimize, to the maximum extent practicable, negative impacts to <br />adjacent properties, water quality and Related Natural Resource Areas-resulting from <br />construction activities; and <br />1.2 Maintain the capacity of the City's stop water system, by mininnizing <br />sedimentation. <br />2, Intent. The intent of these rules, in implementing sections 6.625 to: 6.645 of the <br />Eugene Code, 1971, is to ensure that construction related activities prevent or minimize erosion, <br />Administrative Rule -1 <br />C:Cf FMP\03 ErosionYrev-2ao. ivtrd <br />
The URL can be used to link to this page
Your browser does not support the video tag.