Laserfiche WebLink
where base flood elevation data is provided through the Flood Insurance <br />Study or required as in subsection (d) of this section; <br />(f) Verifying and recording the actual elevation (in relation to mean sea <br />level) and maintaining the floodproofing certifications required in <br />subsection (1) of this section for all new or substantially improved <br />floodproofed structures; <br />(g) Notifying adjacent communities and the Division of State Lands prior to <br />any alteration or relocation of a watercourse, and submitting evidence of <br />such notification to the Federal Insurance Administration; <br />(h) Requiring that maintenance is provided within the altered or relocated <br />portion of a watercourse so that the flood carrying capacity is not <br />diminished; and <br />(i) Maintain for public inspection all records pertaining to the provisions of <br />sections 9.6705 to 9.6709. <br />(3) Within 5 days of the decision, the building official shall mail a notice of the <br />decision and of the opportunity to appeal to the applicant and owners and <br />occupants of property located within 100 feet of the subject property. <br />(4) The decision of the building official may be appealed to the hearings official in <br />the manner provided in this land use code. <br />(Section 9.6707, see chart at front of Chapter 9 for legislative history from 2/26/01 through 6/1/02.) <br />9.6708- Special Flood Hazard Areas - Variances. The building official may approve, <br />conditionally approve, or deny an application for a variance from the provisions of <br />sections 9.6705 to 9.6709, except that no variance shall be allowed within a <br />floodway. The building official's decision shall be based on the following criteria: <br />(1) Compliance with applicable provisions of this land use code; <br />(2) Consideration of all technical evaluations, other relevant factors and standards <br />set forth in section 9.6709, and: - <br />(a) The danger that materials may be swept onto other lands to the injury of <br />others; <br />(b) The danger to life and property due to flooding or erosion damage; <br />(c) The susceptibility of the proposed facility and its contents to flood <br />damage and the effect of such damage on the individual owner; <br />(d) The importance of the services provided by the proposed facility to the <br />2016 PIDS Manual, Appendix B-4 B-4-4 <br />