My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11) CAUPY of the Sokirce frorn which input for Original FIS model rues taken, <br />12) CD with all -input and output files, <br />13)Prirdout of output files ftorn EDIT its for all three floodway, models. <br />The eng4wring "no -rise' certification and.-suppotting technical data must stipulate No <br />impact on tile, 1 -00 -yew flood or floodway elevations at the new arm-sectiong and at all <br />existing cross-sections anywhere in the model.. Therefore, the revised computer iriodal <br />should be run for a sufficient distance (usually one mile, depending on hydraulic slope of <br />the stream) upstream and downstream of the development site to insure, propel' "llo-TISe" <br />Attached is a sample "ata-rise"certiftation form that can be. completed by -a registered <br />professional origin and supplied to the community along with the supporting technical <br />data when applymig for a development perrmit. <br />Octaler 2(" <br />2016 PIDS Manual, Appendix B-5 B-5-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.