Laserfiche WebLink
11) CAUPY of the Sokirce frorn which input for Original FIS model rues taken, <br />12) CD with all -input and output files, <br />13)Prirdout of output files ftorn EDIT its for all three floodway, models. <br />The eng4wring "no -rise' certification and.-suppotting technical data must stipulate No <br />impact on tile, 1 -00 -yew flood or floodway elevations at the new arm-sectiong and at all <br />existing cross-sections anywhere in the model.. Therefore, the revised computer iriodal <br />should be run for a sufficient distance (usually one mile, depending on hydraulic slope of <br />the stream) upstream and downstream of the development site to insure, propel' "llo-TISe" <br />Attached is a sample "ata-rise"certiftation form that can be. completed by -a registered <br />professional origin and supplied to the community along with the supporting technical <br />data when applymig for a development perrmit. <br />Octaler 2(" <br />2016 PIDS Manual, Appendix B-5 B-5-4 <br />