Laserfiche WebLink
C = Cause where, unavoidable accident = 0, negligence=20, intentional =25 <br />E = Effort to correct the violation point total (see Table E) <br />G = Gravity/Magnitude component point total (see Table G) <br />M = maximum. penalty allowed <br />Z = "0" If cause is an unavoidable accident, "1" if cause is negligence or intentional <br />TABLE E: Effort <br />Points <br />Major Effort - Took all steps feasible to correct violation within <br />0 <br />time frame <br />5 <br />Moderate Effort - Took some steps to stabilize situation or to <br />5 <br />correct violation within time frame, additional effort required, <br />15 <br />gravity and magnitude improved by effort <br />25 <br />Little or No Effort- Took minimal or no effort to correct <br />10 <br />violation- violation still exists with same or increased gravity <br />5 <br />and magnitude <br />Hindered Effort - Withheld information, provided false <br />20 <br />information or otherwise hindered efforts to correct violation <br />TABLE G: Gravity/Magnitude <br />Points <br />Failure to adhere or implement condition creates health and <br />safety risks to persons or property <br />30 <br />Failure to revegetate or otherwise stabilize up to 25% of <br />required area <br />5 <br />Failure to revegetate or otherwise stabilize 25-50% of required <br />area <br />10 <br />Failure to revegetate or otherwise stabilize 50-75% of required <br />area <br />15 <br />Failure to revegetate or otherwise stabilize 75-100% of required <br />area <br />25 <br />Failure to stabilize steep slope (25% or more) <br />10 <br />Failure to stabilize moderate slope (10% to 24%) <br />5 <br />Administrative Order - 12 r:\adminord\rule\00treerem2ao.wpd(03/14/00) <br />