My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2026 2:52:22 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
Document_Number
58-16-01
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT INITIAION: Submit Engineering & <br />Construction Agreement <br />Submit Application for Public Improvement Permit <br />& one hard- and electronic copy of plans/analyses <br />Corrects/resubmits application materials; submits <br />utility company concurrences; obtains other <br />required permits; mails first public notice; pays <br />engineering charges <br />PERMIT: Submits 5 hardcopies & electronic copy of <br />approved plans; submits one hardcopy/electronic <br />copy of construction schedule, traffic control plan, <br />manufacturer's data on all materials used, & <br />financial surety (bond); mails second public notice <br />CONSTRUCTION: Does construction surveying; stakes <br />ADA ramps; acts as project manager; secures City <br />approval of design changes <br />POST CONSTRUCTION: Sets/replaces street <br />monumentation; submits TV inspection & testing <br />Provides design consultation <br />Reviews plans/analysis; returns application <br />materials for corrections; bills owner monthly <br />for review costs <br />Secures right-of-way permits from <br />State/County & internal permits (Erosion <br />Prevention/Floodplain Development); obtains <br />staff concurrences; approves plans <br />Reviews/approves submittals & financial surety; <br />issues public improvement permit, authorizing <br />construction; schedules pre -construction <br />meeting <br />CONSTRUCTION: Inspections; approves design <br />changes; provides inspector's notes to <br />engineer <br />WARRANTY: Field checks & inspects; issues <br />acceptance letter (starts warranty period); <br />issues final bill for engineering charges <br />
The URL can be used to link to this page
Your browser does not support the video tag.